My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1994 Council Packet
Orono
>
City Council
>
1994
>
05-23-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 3:58:22 PM
Creation date
12/8/2023 3:54:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LINDQUIST & VENNUM <br />4200 0$ CK«fnF« <br />iO Soir^ <br />Mmnca ^qus mm 90t« Sft4Q2^2205 <br />TuPNCwr €i?'37t«1 <br />tt«OUi9r ViMwA <br />800 ittm Sk0n <br />COLOMOO 802004401 <br />TttJPNM 30>A7>9800 <br />A'PW ncys at cam <br />ROBERT G. MITCHCLt, JR. <br />612-371*3262 <br />Mav z 1994 <br />Mr. James Cradit <br />Cradit and Associates Inc. <br />67 Eighth .Avenue N.E. <br />Minneajxilis. MN 55413 <br />Re: 2677 Casco Pointe Road. Wayzata, Minnesota <br />Our File No. 445482.0001 <br />Dear Jim: <br />I telephoned you on April 25, 1994, and followed that phone call up with a letter <br />inviting vou and the Buceys to get together with Mrs. Smerling. Bruce Schmidt, her <br />architect, and possibly myself as soon as possible to discuss the proposed house for the <br />Buceys’ lot on Casco Pointe Road. You told me that you and the Buceys were in the <br />process of drawing plans, that you thought it would be more beneficial to meet with us <br />after you had drawn vour new plans, and that you would meet with us as soon as your <br />new plans were ready. <br />Apparently, you have a time deadline with Orono of May 9, 1994, for the May 16, <br />1994, Orono Planning Commission meeting. In view of your deadline, we are hopeful <br />you can either meet with us promptly this week, with your plans complete, or better yet, <br />meet with us before vou spend any time and money on new plans so that we can ^alk lO <br />each other about ameliorating the conditions originally proposed. <br />Obviously, we have "a chicken and the egg" problem here. In general, you <br />understand that with the variances you request, the building previously propsed for the <br />Bucey lot is burdensome in the extreme to the Smerlings and their adjacent property. <br />Therefore, in general, the amelioration of the situation is to make the Bucey building <br />smaller and lower so as to reduce its negative impact on its adjacent neighbor. It is <br />difficult for Mrs. Smerling to specify in what fashion you could precisely ameliorate your <br />structure without having some understanding of what changes to y ur original plan you <br />now propose.
The URL can be used to link to this page
Your browser does not support the video tag.