My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-1994 Council Packet
Orono
>
City Council
>
1994
>
05-09-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 3:37:49 PM
Creation date
12/8/2023 3:32:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
522
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />P.O. Box 66 <br />Crystal Bay. MN 55323 <br />473-7357 <br />ZONING FILE #1881 <br />NOTICE OF PLANNING COMMISSION <br />ACTION <br />DATE OF NOTICE: 4/20/94 <br />TO:John E. and Donna M. Whitman <br />1570 Sixth Avenue North <br />Long Lake, MN 55364 <br />COPIES TO: <br />TYPE OF APPLICATION;Variance <br />Conditional Use Permit <br />DATE OF MEETING: 4/18/94 VOTE:6 FOR 0 AGAINST <br />plannin g Commission recommends the following: <br />Approval subject to conditions noted below. <br />pennil from the City prior to commencing <br />construction. <br />2. Construction on the driveway and crossing may not commence until the Minnehaha <br />Creek Watershed District has issued a permit. <br />3.Plan must be revised to include 3:1 finished slopes rather than 2:1 slopes. <br />4.Appropriate erosion control and site protection measures (i.e. "Best Management <br />Practices") shall be maintained during all phases of construction. <br />5.Applicant to execute a Developer’s Agreement and provide a Letter of Credit covering <br />potential costs of restoration should the project be started and not completed m a timely <br />manner. <br />6.Once the stream crossing work is commenced, it shall proceed to completion and <br />revegetation with aU due haste to limit the potential for erosion problems. <br />7.A specific and finite lime frame for completion and restoration shall be established as <br />part of the Developer’s Agreement. <br />8. Culvert to be sized per MCWD requirements, <br />Applicant ’s next scheduled meeting is confirmed as; <br />City CouncU Monday, May 9, 1994, meeting starts at 7:30 p.m. <br />If you desire certified copies of the official Planning Commission minutes, diey are av^ble <br />from the City Recorder after review and approval by the Planning Commission.
The URL can be used to link to this page
Your browser does not support the video tag.