Laserfiche WebLink
16. <br />The park dedication fee for the first phase subdivision of $77,351.00 shall be <br />adjusted to reflect the cost of construction of bike trail on east side of Old Cr\ stal <br />Bay Road The estimated cost of constructing bike trail is $30,920 (1,546 x <br />$■>0 00 per foot). The area of the trail shall be determined by subdivider s <br />surveyor so that an additional reduction can be made to park dedication tee. <br />Applicant to execute Developer’s Agreement to ensure all grading/drainage <br />improvements and road improvements are installed to City ’s satisfaction. No land <br />alterations can take place until erosion control is established and, septic sites <br />fenced and the City is in receipt of final grading and road plans. No <br />improvements can begin until City Engineer has approved all <br />alteration/improvement plans. A Letter of Credit must accompany a fully- <br />executed Developer’s Agreement written to 150% of the cost of the proposed <br />road and site improvements. No building permits will be issued until all drainage <br />facilities have been installed and approved and satisfactory road base completed. <br />Per DNR report of 2/17/94, the DNR must approve all plans and specifications <br />prior to any construction taking place. The following improvements will be <br />required by the DNR: <br />Cleaning/upgrading of existing ditch that runs along the Luce Line <br />adjacent to Coffin property. <br />Replacing existing 18" culvert which is in disrepair. Applicant proposes <br />12" culvert at north end and 18" at southern end. <br />a. <br />b. <br />c. <br />d. <br />Placing a new culvert under the horse trail in the area by the pond south <br />of the Dickey property. <br />Install a second higher culvert through Luce Line adjacent to Coffin <br />property to act as an overflow and to also allow minimal lowering of the <br />elevation of the Luce Line at this location providing applicants ’ plans meet <br />the requirement that slope is no greater than 1%. <br />The following list of final submittals must be submitted to the Zoning Administrator two <br />weeks prior to the regularly scheduled Council meeting on the second and fourth Mondays ot <br />the month. These submittals are as follows: <br />Page 6 of 9