Laserfiche WebLink
2. <br />3. <br />5. <br />6. <br />7. <br />8. <br />The subdividers shall be responsible for installing an 8 ’ wide bike trail along the <br />east side of Old Cr>'stal Bay Road as shown on plans dratted by Mark Gronberg <br />of Coffin & Gronberg, Inc., Job No. 93-411 dated March 31, 1994. The City <br />shall adjust the park dedication fee to reflect the subdivider’s cost for constructing <br />the trail and for the area oi the 1,546’ long bike trail. <br />Dedication of drainage and utility easements 5’ along all interior lot lines and 10’ <br />along the perimeter boundaries and adjacent to road rights-of-way. <br />Prior to any site improvements, erosion control as shown on preliminary grading <br />and drainage plans must be installed and maintained until natural groundcover is <br />restored. <br />Prior to site grading improvements all tested septic sites on the Coffin property <br />must be fenck off and the following lots in the first phase development of the <br />Dickey property must be fenced off: <br />Lots 1-6, Block 1 <br />Lots 3-7, Block 2 <br />Drainfields on Lots 1 and 3, Block 1 to be moved 5’ to east to allow for adeqiwte <br />separation from future bike trail. Applicant to grant trail easement over Old <br />Crystal Bay Road bike trail along western boundary of Dickey property. <br />Applicant shall be responsible for constructing Old Crystal Bay Road bike trail <br />as set forth in trail improvement plans of City of Orono. <br />Well pit must be sealed within Lot 2, Block 2 of the Dickey property. <br />The following lots have been found to contain protected wetlands not designated <br />on the City’s conservation area maps: <br />Dickey parcel - Lot 2, Block 1; Lots 3, 4, 5 and 6, Block 2 <br />Coffin property - Lots 1, 5, 6 and 10 <br />Page 4 of 9