My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-28-1994 Council Packet
Orono
>
City Council
>
1994
>
03-28-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 1:54:09 PM
Creation date
12/8/2023 1:52:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO CITY COUNCIL MEETING <br />HELD MARCH 14, 19W <br />(#6) #1903 TANDEM PROPERTIES, 2645/3025 WATERTOWN ROAD - PRELIMINARY <br />SUBDIVISION <br />Mabusth explained this is the first phase of a 46 lot future subdivision and consists of 25 lots <br />(15 lots located within the Dickey property and 10 lots jcated within the Coffin property). <br />Countryside Drive shall be extended to Old Crystal Bay Road and dedicated as a public road. <br />Applicant shall create a cul-de-sac road going west from Old Crystal Bay Road. Countryside <br />Drive West shall be maintained by private property owners. As for the Coffin pro^rty. two <br />cul-de-sac roads are shown. All lots have adequate on-site septic development. Each lot meets <br />the 2 acre dry contiguous land requirement. The property is currently bemg reviewed by the <br />Watershed District for possible protected wetland areas. There is concern that the connection <br />of the two cul-de-sacs on the Coffin property would impact smaller lots m ^ Place <br />neighborhood and a possible intnision of lights. There is a back lot served by a 30 wide outlot <br />which meets all the requirements of a back lot configuration. Major issues are stormwater <br />retention and the impact of development resulting in increased runoff for downstream drainap. <br />The DNR is concerned with possible impact to the Luce Line Trail and is asking for extension <br />of a culvert beneath the horse trail. <br />Mayor Callahan asked for clarification regarding drainage flowage from the Coffin property to <br />the Dickey property. <br />Mabusth said it is an existing drainage way and pointed out the direction of the flowage. <br />Mark Gronberg. licensed surveyor with Coffin & Gronberg. Inc., explained Acre are two major <br />drainage areas on the Dickey site and two large ponds are proposed to retain the water. <br />Kelley suted he lives in the area and is familiar with the drainage concerns. Presently water <br />problems exist from the Coffin property and pointed out where ponding occurs causing »ptic <br />problems for the Dougans. Drainage from the Dickey property currenUy causes problems <br />particularly to the Shannon property. <br />Gronberg reviewed drainage for the Coffin property and identified two problems. One probto <br />is being corrected by an outlet pipe and also from the developmem of a ponding area. TOe oter <br />area bounded by the Luce Line Trail, will capture water by a series of holding ponds. This <br />results in a 1/3 reduction in the flow rate of water going downstfeam. <br />Mayor Callahan inquired where the balance of the water goes. <br />Gronberg explained it goes through the Lawton ditch, crosses under Old Crystal Bay Road and <br />travels through the Dougan property at a slower rate
The URL can be used to link to this page
Your browser does not support the video tag.