Laserfiche WebLink
Zoning FUc #1902 <br />February 14, 1994 <br />Page 3 <br />4. <br />5. <br />the principal use. The code does not appear to limit the number of uses permitted or <br />conditional on a property. Note code only allows a conditional use permit for crop use <br />if area exceeds ten acres. Is this too intense a use of the 8.6 acre residential lot? <br />Should a property currently under subdivision review be a suitable candidate for the <br />planting of crops? If septic areas were fenced off prior to cultivation, the owner may <br />have taken the necessary precaution but in any case it is at Mr. Suess’s risk if he allows <br />the crop use without first protecting his primary interest. What is the opinion of the <br />Planning Commission? <br />Review Exhibit G. Tte existing septic system is to the immediate west with an alternate <br />site shown to the immediate north, located to west and north of detached garage, <br />somewhere in the area of the proposed temporary greenhouse. Mr. Hallson has noted <br />an interest in subdividing his property at some time in the fiimre. It may be to Mr. <br />Hallson ’s benefit to now secure septic location before heavy equipment compacts area <br />suitable for septic use. Prior to any land alterations or installation of greenhouse, staff <br />would have to ask that existing septic system be staked off and protected. If Mr. Hallson <br />has had an alternate septic site tested, that area should also be staked off. <br />Consider the Dickey and the Hallson properties, is this a suitable site to install temporary <br />greenhouse? Will the 3.5 acre planting area be adequate for applicant’s needs if <br />additional acreage is not available at the Suess property? <br />Resolution No. 3098 that granted approval of the temporary greenhouse on the Dickey <br />property was granted without any limits on the time for the use of the temporary <br />structure. Should this conditional use permit be limited for a specified time? Should the <br />conditional use permit be renewed each year? <br />Options of Action <br />Any recommendation of approval must include the following conditions: <br />1. <br />3. <br />Structure shall be installed to meet all required standards of the State Building and <br />Fire Codes. <br />Use of structure shall be limited to the specific period March 25 - June 15. <br />When strucnire is taken down, strucnire must be removed immediately from site <br />and not stored on 8.6 acre parcel.