Laserfiche WebLink
. /CITY OF ORONO1993 BID TABULATIONS FOR STREET MATERIALS & EQUIPMENT RENTALALL QUANTITIES ARE BID IN TONS - EQUIPMENT IS BID PER HOURLY RATE1 ALL PRICES TO <br />BE DELIVERED <br />12" CMP <br />16 GAUGE <br />15" CMP <br />16 GAUGE <br />18“ CMP <br />16 GAUGE <br />24" CMP <br />14 GAUGE <br />24" CMP <br />16 GAUGE <br />36" CMP <br />14 GAUGE <br />48" CMP <br />12 GAUGE <br />60" CMP 1 <br />10 GAUGE 1 <br />II.V. Johnston 6.17 7.60 9.03 14.73 11.89 21.78 40.36 63.10 <br />All Steel Products 5.25 6.25 7.90 12.00 10.00 17.00 34.00 62.00 ■ <br />Contech 6.25 7.10 8.15 12.50 10.35 19.65 33.00 60.80 <br />ALL PRICES TO <br />BE DELIVERED <br />12" <br />APRON <br />15" <br />APRON <br />18" <br />APRON <br />24" <br />APRON <br />36" <br />APRON <br />48" <br />APRON <br />60" 1 <br />APRON 1 <br />II.V. Johnston 31.50 39.60 51.30 76.50 225.00 541.80 951.30 1 <br />All Steel Products 35.00 44.00 54.00 85.00 250.00 550.00 975.00 <br />Contech 32.75 41.50 53.90 80.25 237.05 549.50 979.50 <br />ALL PRICES TO <br />BE DELIVERED <br />12" <br />BAND <br />15" <br />BAND <br />18" <br />BAND <br />24" <br />BAND <br />36" <br />BAND <br />48" <br />BAND <br />60" <br />BAND <br />ILV. Johnston 6.17 7.60 9.03 11.89 21.78 60.54 94.65 <br />• <br />All Steel Products 5.25 6.25 7.90 12.00 25.00 68.00 93.00 <br />Contech 6.25 7.10 8.15 10.35 19.65 49.50 91.20 <br />i