My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-10-1994 Council Packet
Orono
>
City Council
>
1994
>
01-10-1994 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 12:27:44 PM
Creation date
12/8/2023 12:25:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water and Sei»er Rate Study <br />January 6. 1994 <br />pa«e2 <br />3. The irKKiificd operating rate was used as the basis fOT senmg the current rates. <br />4. The utility rates should not reflect full dcpreciatK>n because this would impoa too large <br />a burden on the current utilits customers. <br />Proposed Rate Increases <br />The rate study resulted in a staff recommendation to increase both sewer and water rates by <br />approximately 30^ The rate increases for both sew^r and water arc divided into an <br />admtmstrative ind billing charge and an operation and maintenance charge. The administrative <br />and billing charge rctlects the costs of ihr: utility billing clerk and a jxmion of other finance <br />staff, the Public Works Director and the City Adininisirator for administrative support including <br />general accounting, financial managenieni and geneui managen«nt support. <br />The administrative and billing charges have increased by large percentages but relatively small <br />dollar amounts. The increase is due to more closely reflecting the actual cost of providing <br />administrative support for these funds. <br />Sewer Fund Operating Budget <br />The operating loss in the sewer fund in 1992 was due mostly to a $60,000 increase in MWCC <br />charges. This trend of rapidly increasing MWCC charges will continue through 1995. The <br />large increases in MWCC charges are due to the sudden change from very dry conditions to <br />very wet conditions in the early 1990 ’s. Because the MWCC estimates flows as the basis tor <br />annual billing, they make a correction to reflect the actual flows on a two year time lag. <br />In the late 1980’s the dr> conditions were resulting in credits of $40-50.000 due to actual flows <br />being much lower than estimates. In the very wet early 1990 ’s the flows were much higher than <br />the estimates. This substantially increased MWCC charges for two reasons. First, the flows <br />were substantially higher. Second, the $40-50.000 credits were replaced by $40-50,000 debits <br />due to the flow being substantially above the MWCC estimates. This double increase has <br />resulted in MWCC charges increasing from $165,000 in 1991 to $281,000 in 1994. This is a <br />70% increase over tour years or a 17.5% average annual increase. The MWCC fees are lurther <br />projected to increase to $320,000 in 1995. This would be a 94% increase over five years. <br />The large fluctuation MWCC charges based on wet and dry conditions makes it clear that <br />infiltration and inflow (I & I) is a sig:ificant problem in the City’s sewer system. Staff is in die <br />process of updating the City’s 19801 & I Study to identify the cause of the 1 & I and determine <br />the most cost effective .wluiions. <br />Sewer Rate Increases <br />Attachment A shows the staff’s recommendation concerning sewer rates and a comparison to <br />current rates. Attachment B shows the alternate rates under the minimum, modified, and fiiil
The URL can be used to link to this page
Your browser does not support the video tag.