Laserfiche WebLink
HfWf . V-v..;-•led storm run-off study to at a maintenance plan bef precast concrete. This <br />jroperty will be of wood. <br />construct this structure <br />i 1305.6905, special fire <br />the entire structure with <br />tion for the building on <br />1 not be required. <br />The existing dumpster is <br />Dumpster has been located <br />This signage will be on <br />tage of sign space per lot <br />for each front foot of <br />Dt of lot not occupied by a <br />square feet. <br />to 1.5' ht. s.f. will be as <br />e - meets requirements of <br />ze of the lettering. <br />g. Proper signage must be <br />iiPM <br />mM <br />W <br />• V’; • <br />;vV' -■ <br />mmm ■ I <br />•W-: <br />:^y ^iii <br />Vi mm■Mill mm <br />nmm <br />I <br />w <br />^0m <br />m <br />Zoning Pile #1263 Page 7 .v^v: ^riocVt'/a :s:rJ'’/..U^:te^rnVr.r!;Jnrur:"Ar,.Duspster must be tainimuin 5* from building. <br />AFpYicant^has*pall 6 sac's in the past (Exhibit M 6 N). <br />This was for 3000 s.f. retail - 1 Sac <br />Boat pump out " ^ <br />With the enlargement of the structure V)* <br />Browns Bay side of property. I have reviewed the property for any other <br />charges. <br />In doing so I spoke with Don Bloom 6 Roger from the Metro Waste Commission <br />which stated the following: <br />The existing structure, 2740 s.f. required 1 sac unit. As it was unJer <br />3000 s.f. <br />With the additional a.f. added (2260 s.f.) An <br />charged. They also stated 1 sac unit would be required for the gazlxj^^^^^ <br />The total additional sac units required for the project is two at 54:0.00“ <br />or ♦SOO.Otrj/, too- oo <br />ArpU?lnt\r.'^hcwn on Exhibit S th.,«... which <br />arLs. They are proposing to add additional trees and bushes in the front <br />of the building and where the dumpster existed. <br />Staff has recommended that the area south of the crane be mad. into green <br />area. <br />Acclicant is requesting to enter into a development agreement with the <br />City\ They are proposing a three year time period to complete the proposed <br />const.ruction and land iinprovcnisnts. Se© Exhibit. • <br />staff has spoken with the c’ty attorney on this <br />attorney stated that this is available to the city with appropriate <br />agreement as long as the City is convinced that this is a positive project. <br />Applicant must provide a detailed agreement of work to be completed and a <br />letter of credit for all work which is left at time of occupancy. <br />Staff Recommendation . . . , ._ _^Staff recbmmends approval of the commercial site plan based on the <br />following.proposed structure and operation is detrimental to the <br />public health, safety, and welfare, or materially injurious t <br />properties or improvements in the vicinity. <br />2. Better control of drainage. <br />r :. <br />.• • *. ♦ •• <br />Y ■ <br />■