My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
05-16-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 12:36:58 PM
Creation date
12/7/2023 3:02:17 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File 11277 Page 3 <br />Once again, this phase of the application will be presented for Council <br />action at their May 23, 1980 meeting. If Planning Commission has any <br />comments or concerns regarding the operation of the camp under this <br />temporary permit please advise staff. <br />Day Use Recreation - Conditional Use Permit - In the applicants addendum <br />information, they asked for special consideration regarding a comprehensive <br />permit approval that would provide direction to staff so that if specific <br />conditions are met, staff would have the authority to allow either the day <br />use recreation or overnight camping uses, rather than apply for seperate <br />permits. As staff noted above, if the application that was scheduled to be <br />reviewed at present was to include overnight camping, that a survey would <br />have been required so that setbacks and improvements could be located with <br />the setbacks confirmed per RS and NFPA standards. For the current review, <br />the applicant has submitted preliminary comments and submittals but that <br />your final review of the day use recreation phase of the application will <br />be at your June 6 meeting. If Planning Commission members accept the <br />applicants request to establish appropriate guidelines for further staff <br />approval then staff must ask for the survey at this point. As staff noted <br />above, the site plan on file that has been used for all previous reviews <br />was accepted just for he day use recreation permit. <br />In preparation for the June 6 meeting, staff requests the following <br />additional information and submittals: <br />I. To expand the site plan submitted for day use showing: <br />A. All existing structures, even though not in use. <br />B. Picnic shelter and information or elevations on the picnic <br />shelters, the number and locate then on the site. <br />C. Designate the two coi let/lavatories structures for use. <br />D. Provide more information on fire stations/fire ring. <br />Applicant has advised that all cooking would be done with <br />stoves/grills located within the picnic shelters, fire stations <br />were to consist of 55 gallon drums with buckets located somewhere <br />in the area. . , , . <br />E. Locate new 20 slip dock and locate area for informal mooring <br />of boats along shore for additional guests arriving via boats <br />F. Future location of helipad on island. <br />G. Designate area to be subdivided at some future date. (1 <br />approximate area of lands.) <br />H. Locate small/fishing boats on land storage area. <br />I. Other improvements for day recreation use that Planr <br />Commission feels should be located and designated on the f <br />plan. <br />2. Applicant is advised to apply for an LMCD permit for the expansioi <br />dock use. <br />In addition to the 8 for camp use and 20 transient slips for visitors. <br />City will also require a joint use dock license. <br />3. Signage If signage is proposed for the island the City must app: <br />the signage and the location of the signage on the island. This does
The URL can be used to link to this page
Your browser does not support the video tag.