Laserfiche WebLink
QkIQSBm <br />Tos Planning Commission Chairman Kelley <br />Orono Planning Commission Members <br />City Administrator Bernhardson <br />Proa: Jeanne A. Mabusth# Building & Zoning Administrator <br />Date:May 12, 1968 <br />- ConditionalSabject: #1273 Roll In fc Sharon Lacy 2655 North Shore Drive <br />Use Permit and Variance - Public Hearing <br />toning District - LR-IA <br />Pertinent Ordinances - 10.22, Subdivision 2 Applicant wishes to fill <br />within 75' of the lakeshore where no fill is allowed. Section 10.03, <br />Subdivision 19 A Condition Use Permit is required for filling within the <br />lakeshore area. <br />List o£ Bahibits <br />Exhibit A - <br />Exhibit B - <br />Exhibit C - <br />Exhibit D - <br />Exhibit E - <br />Exhibit F - <br />Exhibit G - <br />Application <br />Property Owners List <br />Plat Map <br />Applicants Addendum <br />Applicants Sketch of Pill Project <br />Survey of Property <br />Staff Sketch <br />of Application ~ As applicants' addendum notes, the erosion of the <br />shoreline has gradually made its impact, but sustained severe erosion <br />damage with last years storm in July. The erosion noted around the tree <br />was sustained during the sever storm. The irregular shoreline from <br />the normal amount of erosion along the shore can be observed by the <br />existing shorelines to the east and west that have already been rip-rapped. <br />The applicants have filed for a rip-rap permit with the Minnehaha Creek <br />Watershed District. It was their intention to fill behind the rip-rap to <br />restore the lakeshore bank and was advised by staff that a Conditional Use <br />Permit and variance would be required. The applicant proposes a total <br />amount of 339 cubic yards of fill. <br />Staff inspected the lakeshore with the city engineer and he advised that <br />the high part of the rip-rap (portion of the rip-rap that abuts the land <br />sloping to the lake) that runs to the east of the dock should line up <br />approximately with the center of the first dock section. The intent is to <br />line up with the rip-rap with the east property and would approximately set <br />it just to the edge of the pump station. The large tree that has been cut <br />at the lakeshore would have to be removed in order for the rip-rapping to <br />be Installed. The engineer notes that the exposed cottonwood roots have <br />already died off and should be trimmed out and filled. To the west of the <br />dock rip-rap should again line up somewhat with the mid section of the dock <br />and then arch over to line up with the west property rip-rap. Filling <br />behind the rip-rap in that location will protect the 7 or 8 pines along the <br />shoreline. Observe the rip-rap and bank slopes of the west property line, <br />the proposed Inprovement will match exactly with the west property line.