My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-1988 Planning Packet
Orono
>
Planning Commission
>
1988
>
03-21-1988 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 10:38:58 AM
Creation date
12/6/2023 11:56:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•i^.' A ■■•••'■■ Mmm•v=^r.Leyj Administrator <br />tertown Road <br />Hearing <br />Type III Classification <br />ass III SubdlvlBlon * <br />if public road. <br />ly detached dwelling <br />tnces existing - non- <br />d for domestic purposes <br />ent lot lines and 150* <br />3. <br />lotA - unbuildable lot <br />mildability. <br />:es8ory structures located <br />.pal structure. <br />of her 72 acre homestead <br />standard requirement of <br />[ residential structures <br />he barns as noted above <br />jacent residential lot <br />jm existing residence <br />used for the domestic <br />The final resolution <br />r future owner of Lot 1. <br />the only lot that will <br />t \ <br />1 <br />• • • ; • ‘ ^ ... .• . •• SV <br />•''■a■. • • • . 1-,. » <br />•• • i-.. ..IS* <br />M0yy <br />. m <br />a; <br />■'•'/ V.'■■■AA' ’■ <br />• : <br />. ■■■ A <br />"-:vA <br />■'A.A-' •• • -^A <br />■" :.v <br />^''y-y' <br />A?mm ISoniiig File 11257 March 14, 19tS IFage 2 of 3be sold for new residential development. Fer Section 10.27 Subdivision 2, the two residences on proposed Lot 2 remain a inon-conforeing use. Applicant at this time does not wish to divide off the rental house. In review of the current proposal (relation of proposed lot lines to existing Improvements) the <br />house with five acres can be subdivided satisfying all SR"1A <br />standards at a future date. Staff would recommend if proposed <br />Lot 2 is further subdivided in the future that a determination be <br />made regarding the rental unit. The final resolution should <br />include this notice to the applicant. <br />Fer Section 10.03 Subdivision f (A), in creating Lot 1, the <br />City is asked to approve creation of a non-conforming use. Th® <br />accessory structures/barns cannot receive the credit of the <br />principal residence. Once again, staff has been made aware <br />that this is the lot that will be sold for immediate development <br />but thm city Bay wish to aatabliah a Halt on tha duration of tha <br />^l^ae the structurea remain non-conforming. Staff would suggest IE <br />the property has not been aold within a year that the applicant <br />wnild have to legally coaA>ine Lota 1 and 7 (or, if the new owner <br />has not obtained a building permit for a principal structure <br />within 1 year, the barns would have to be removed). This again <br />■ay also be a raatrictlon to be included in a final resolution <br />for the plat. <br />Per Section 11.03 Definition 24, the outlet conaiatinq of <br />0. 95 acraa is unbuildable and may be considered for combination <br />with an adjacent property on the south aids of Luce Line. <br />The City will ask for appropiata dedication of Stubbs Bay <br />Road and Watertown Road. The designated wetlands within the east <br />portion of the property will be defined in anglea and bearings <br />on the final plat. In addition the City will ask for a Flowage <br />Conservation Easement over the wetland area. <br />The City Engineer has reviewed the subdivision in regard to <br />access and finds adequate area to define safe access to the <br />proposed iot-w. The City Engineer does caution that Lot 1 BlocK <br />1, becc lae of the curve, early care be given in contacting the <br />city for safest location of a future access to Lot 1 BlocJt 1. <br />Septic testing has not been required for proposed lots <br />because they clearly exceed 5 acres in area. The existing septic <br />systems that serve the residences are conforming and meet all <br />setback standards from newly proposed lot lines. We have not <br />required alternate septic testing because of the 30 acre area. <br />..... .. <br />;w ■ <br />■ AAaf Av <br />• • . ■ • ■ : ■ —.; • ••• . <br />mm?my <br />v:- •.■■■; ■■ -
The URL can be used to link to this page
Your browser does not support the video tag.