Laserfiche WebLink
DWELLINGPROPOSEDLEGAL DESCRIPTION:Lot 12, Wallace's Addition to the Village of Minnetonka Beach, Hennepin County, Minnesota.SCOPE OF WORK & LIMITATIONS:1. Showing the length and direction of boundary lines of the legal description listed above. The scope of our services does not include determiningwhat you own, which is a legal matter. Please check the legal description with your records or consult with competent legal counsel, ifnecessary, to make sure that it is correct and that any matters of record, such as easements, that you wish to be included on the survey have beenshown.2. Showing the location of observed existing improvements we deem necessary for the survey.3. Setting survey markers or verifying existing survey markers to establish the corners of the property.4. Existing building dimensions and setbacks measured to outside of siding or stucco.5. Showing and tabulating impervious surface coverage of the lot for your review and for the review of such governmental agencies that may havejurisdiction over these requirements to verify they are correctly shown before proceeding with construction.6. Showing elevations on the site at selected locations to give some indication of the topography of the site. We have also provided a benchmark foryour use in determining elevations for construction on this site. The elevations shown relate only to the benchmark provided on this survey. Usethat benchmark and check at least one other feature shown on the survey when determining other elevations for use on this site or beforebeginning construction.7. This survey has been completed without the benefit of a current title commitment. There may be existing easements or other encumbrances thatwould be revealed by a current title commitment. Therefore, this survey does not purport to show any easements or encumbrances other than theones shown hereon.6. While we show a proposed location for this home or addition, we are not as familiar with your proposed plans as you, your architect, or thebuilder are. Review our proposed location of the improvements and proposed yard grades carefully to verify that they match your plans beforeconstruction begins. Also, we are not as familiar with local codes and minimum requirements as the local building and zoning officials in thiscommunity are. Be sure to show this survey to said officials, or any other officials that may have jurisdiction over the proposed improvementsand obtain their approvals before beginning construction or planning improvements to the property.STANDARD SYMBOLS & CONVENTIONS:"●" Denotes iron survey marker, found, unless otherwise noted.#43503LICENSE NO.Wayne W. PreuhsDATES1AUGUST 24, 2023Minnetonka, Minnesota 55345Phone (952) 474-796417917 Highway No. 7Web: www.advsur.comAdvanceSurveying & Engineering, Co.LUCID BUILDERS3359 CRYSTAL BAY RD.CLIENT/JOB ADDRESSORONO, MNSHEET TITLEPROPOSED SURVEYSHEET NO.SHEET 1 OF 1DWG ORIENTATIONSCALE231241 JRDRAWING NUMBER20'10'0JULY 20, 2023DATE SURVEYED:AUGUST 24, 2023DATE DRAFTED:SHEET SIZE: 17 X 22EXISTING HARDCOVERHOUSE928 SQ. FT.PORCH185 SQ. FT.DRIVEWAY621 SQ. FT.DECK107 SQ. FT.WALK238 SQ. FT.STEPS43 SQ. FT.LAKE DECKING46 SQ. FT.TOTAL EXISTING HARDCOVER 2,169 SQ. FT.AREA OF LOT (TO OHW) *5,500 SQ. FT.LOT COVERAGE39.4% NOTE: BOULDER WALL NOT INCLUDED INHARDCOVER CALCULATIONS. *CRYSTAL BAY ROADAREA IS EXCLUDED FROM TOTAL LOT AREA ANDHARDCOVER TOTALS (917 SQ. FT.)GRADING & EROSION CONTROL NOTES:BEFORE DEMOLITION AND GRADING BEGIN·Install silt fence/bio roll around the perimeter of the construction area.·Sediment control measures must remain in place until final stabilization hasbeen established and then shall be removed. Sediment controls may beremoved to accommodate short term construction activity but must bereplaced before the next rain.·A temporary rock construction entrance shall be established at each accesspoint to the site and a 6 inch layer of 1 to 2 inch rock extending at least 50 feetfrom the street into the site and shall be underlain with permeable geotextilefabric. The entrance shall be maintained during construction by top dressingor washing to prevent tracking or flow of sediments onto public streets, walksor alleys. Potential entrances that are not so protected shall be closed byfencing to prevent unprotected exit from the site.·Contractor shall install inlet protection on all existing storm sewer inlets inaccordance with the city standard details. Inlet protection shall also beprovided on all proposed storm sewer inlets immediately followingconstruction of the inlet. Inlet protection must be installed in a manner thatwill not impound water for extended periods of time or in a manner thatpresents a hazard to vehicular or pedestrian traffic.DURING CONSTRUCTION:·When dirt stockpiles have been created, a double row of silt fence shall beplaced to prevent escape of sediment laden runoff and if the piles or otherdisturbed areas are to remain in place for more than 14 days, they shall beseeded with Minnesota Department of Transportation Seed Mixture 22-111 at100 lb/acre followed by covering with spray mulch.·A dumpster shall be placed on the site for prompt disposal of constructiondebris. These dumpsters shall be serviced regularly to prevent overflowingand blowing onto adjacent properties. Disposal of solid wastes from the siteshall in accordance with Minnesota Pollution Control Agency requirements.·A separate container shall be placed for disposal of hazardous waste.Hazardous wastes shall be disposed of in accordance with MPCArequirements.·Concrete truck washout shall be in the plastic lined ditch and dispose ofwashings as solid waste.·Sediment control devices shall be regularly inspected and after major rainfallevents and shall be cleaned and repaired as necessary to provide downstreamprotection.·Streets and other public ways shall be inspected daily and if litter or soils hasbeen deposited it shall promptly be removed.·If necessary, vehicles, that have mud on their wheels, shall be cleaned beforeexiting the site in the rock entrance areas·Moisture shall be applied to disturbed areas to control dust as needed.·Portable toilet facilities shall be placed on site for use by workers and shall beproperly maintained.·If it becomes necessary to pump the excavation during construction, pumpdischarge shall be into the stockpile areas so that the double silt fence aroundthese areas can filter the water before it leaves the site.·Temporary erosion control shall be installed no later than 14 days after the siteis first disturbed and shall consist of broadcast seeding with MinnesotaDepartment of Transportation Seed Mixture 22-111 at 100 lb/acre followed bycovering with spray mulch.·Erosion control measures shown on the erosion control plan are the absoluteminimum. The contractor shall install temporary earth dikes, sediment traps orbasins and additional silt fencing as deemed necessary to control erosion.SITE WORK COMPLETION:·When final grading has been completed but before placement of seed or sodan “as built” survey shall be done per City of Orono requirements to insurethat grading was properly done.·When any remedial grading has been completed, sod or seeding shall becompleted including any erosion control blankets for steep areas.·When turf is established, silt fence and inlet protection and other erosioncontrol devices shall be disposed of and adjacent streets, alleys and walksshall be cleaned as needed to deliver a site that is erosion resistant and clean.·Contractor shall maintain positive drainage of a minimum 2% slope awayfrom proposed building.PROPOSED HARDCOVERHOUSE (INCL. CANTILEVERS) 1,813 SQ. FT.FRONT WALK34 SQ. FT.DRIVEWAY562 SQ. FT.REAR PATIO59 SQ. FT.LAKE DECKING46 SQ. FT.TOTAL PROPOSED HARDCOVER 2,514 SQ. FT.AREA OF LOT (TO OHW) *5,500 SQ. FT.LOT COVERAGE45.7%(*CRYSTAL BAY ROAD AREA IS EXCLUDED FROM TOTALLOT AREA AND HARDCOVER TOTALS (917 SQ. FT.))Resol. No. 7422 Exhibit A