My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-2023 City Council Agenda Packet
Orono
>
City Council
>
2023
>
11-13-2023 City Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 1:10:14 PM
Creation date
11/22/2023 1:02:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. 7417 <br /> <br /> <br />5 <br /> <br />Property would be challenging. The variances for lot area and width, setback, and <br />hardcover are necessary, and do not merely serve as a convenience to the Applicant. <br /> <br />CONDITIONAL USE PERMIT ANALYSIS: <br />The Council may grant a CUP as the use permit was applied for or in modified form. On the <br />basis of the application and the evidence submitted, the city finds that the proposed use at <br />the Property is or will be: <br /> <br />C1. Consistent with the community management plan; the proposed development of the <br />Property for residential use is consistent with the community management plan. <br /> <br />C2. Compliant with the zoning code, including any conditions imposed on specific uses as <br />required by article V, division 3 of the City Code; with the exception of the currently <br />requested variances, the project will conform to all applicable zoning requirements. <br /> <br />C3. Adequately served by police, fire, roads, and stormwater management; in the opinion of <br />staff this criterion is met. <br /> <br />C4. Provided with an adequate water supply and sewage disposal system; in the opinion of <br />staff this criterion is met. <br /> <br />C5. Not expected to generate excessive demand for public services at public cost; in the <br />opinion of staff this criterion is met. <br /> <br />C6. Compatible with the surrounding area as the area is used both presently and as it is <br />planned to be used in the future; the development of the Property for residential use is <br />compatible and consistent with the neighborhood and surrounding uses. <br /> <br />C7. Consistent with the character of the surrounding area, unless a change of character is <br />called for in the community management plan; development of the Property for residential <br />use is compatible and consistent with the neighborhood and surrounding uses. <br /> <br />C8. Compatible with the character of buildings and site improvements in the surrounding <br />area, unless a change of character is called for in the community management plan; in <br />the opinion of staff this criterion is met. <br /> <br />C9. Not expected to substantially impair the use and enjoyment of the property in the area or
The URL can be used to link to this page
Your browser does not support the video tag.