My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-2023 City Council Agenda Packet
Orono
>
City Council
>
2023
>
11-13-2023 City Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 1:10:14 PM
Creation date
11/22/2023 1:02:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From:Tom Major <br />To:Melanie Curtis <br />Cc:Susan Major <br />Subject:Prelim Plat Approval LA22-000059 <br />Date:Monday, October 9, 2023 10:53:17 AM <br />Hi Melanie, <br /> <br />As discussed over the phone today, we are the homeowners for 37 years at 2200 Devin Lane, Orono. <br />Our property is adjacent to the south of the proposed platted property. The drainage ditch flowing <br />across the proposed platted property flows into/across our property for most of its southernly <br />direction. <br /> <br />Several years ago we began to notice sandy erosion depositing on the ditch bed along the length of <br />our property. Previous to these last few years there was no sand in the banks nor bottom of the <br />ditch on our property. It could only come from north of our property. The sandy erosion has added <br />12+ inches to the bottom level of the ditch. We notified the City of Orono who inspected and <br />verified our concern. We have not heard anything since. <br /> <br />With the proposed plat approval we are concerned about the following: <br /> <br />1. During construction, erosion control in the event of storms. If not, a significant amount of <br />loose sand will flow and settle downstream. <br />2. Construction design of erosion control providing for water level increases of several feet <br />during heavy storms. <br />3. Additional erosion control protection on east bank of ditch as flow is redirected towards the <br />south. <br />4. Removal of existing sand eroded and deposited downstream from proposed platted property. <br /> <br />Thanks for your consideration of these issues. <br /> <br />Thomas & Susan Major <br />2200 Devin Lane <br />Orono, MN 55356 <br />612-839-4427 <br /> <br /> <br /> <br />Sent from Mail for Windows <br />
The URL can be used to link to this page
Your browser does not support the video tag.