My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-2023 City Council Agenda Packet
Orono
>
City Council
>
2023
>
11-13-2023 City Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 1:10:14 PM
Creation date
11/22/2023 1:02:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2245 Watertown Rd Long Lake, MN 55356 <br />Ditch Restoration <br />I have resided at the aforementioned address for over 30 years. During this time, a <br />drainage ditch has consistently run through my property. It flows briefly after storm events but remains dry for most of the year since I acquired the home. The channel has <br />always maintained a fairly level and stable condition, with vegetated side slopes. <br />In 2017, the cities of Long Lake and Orono initiated an "improvement" project for Watertown Road and the surrounding streets. This project included the installation of <br />curbs and gutters and a rerouting of the neighborhood's runoff from north Watertown Road directly into the drainage ditch on my property through an upgraded culvert. <br />Additionally, erosion fabric was placed from the new culvert to approximately 20 feet downstream in the existing ditch. <br />However, these road enhancements led to a higher volume of stormwater runoff being <br />directed to the culvert. This, in turn, resulted in severe erosion extending well beyond the 20-foot area that was fortified. The side slopes lost their vegetation, the channel <br />bottom became unstable, and it started eroding backward toward the culvert. <br />Despite my numerous unsuccessful attempts to elicit a response from the city, I eventually reached out to the Mayor, who conducted a site visit with other city <br />employees. He remarked that it was the most severe erosion he had ever seen and committed the city to participate in the restoration efforts. We reached an agreement in <br />which I, as the homeowner, would oversee the site work, including labor and equipment, <br />and provide the necessary fabric, while the city would supply the riprap. <br />To ensure the proper execution of this project, the city required me to obtain the <br />necessary permits. This involved a property survey, which has been successfully completed by Gronberg and Associates. Furthermore, a wetland delineation was <br />conducted in collaboration with The Corps of Engineers, Minnehaha Creek Watershed District, and Kjolhaug Environmental Services. All of these assessments concluded that <br />there are no wetlands on the property and unanimously attributed the erosion to the rerouting of runoff resulting from the 2017 road construction. The Ditch Restoration <br />proposal by Gronberg and Associates will effectively manage runoff and prevent future erosion. The proposal aims to slow the flow of storm events through the channel and <br />prevent future erosion and backward erosion. The plan also rectifies an unstable eroding cutbank of nearly 90 degrees.
The URL can be used to link to this page
Your browser does not support the video tag.