Laserfiche WebLink
MINUTES OF THE <br /> ORONO PLANNING COMMISSION <br /> October 16,2023 <br /> 6:00 o'clock p.m. <br /> he has been there 33 years.He has worked with the Corps of Engineers and the Watershed District to <br /> come up with a plan to mitigate the erosion. <br /> Chair Bollis opened the public hearing at 6:07 p.m. <br /> Tom Major, 2200 Devin Lane,said he is the property owner to the south of this property so the ditch <br /> flows into his property. They have been there 37 years and had no problem until two to four years ago. <br /> Sand has raised the bottom of the ditch a foot or more.He asked if downstream effects of the project have <br /> been looked at. He said there is also a flood plain below that next to another property. The ditch is along <br /> the property line between the two houses. <br /> Heidi Hust,2225 Devin Lane,said they have been in the house almost 20 years and the road project up on <br /> the corner was a huge disaster. The silt came down and destroyed everything, she said,adding she is a <br /> professional gardener and used to take her Girl Scouts down that area and the marsh has changed so much <br /> and a delta has formed. They have lost a half a dozen trees due to standing water.It is a deep ditch and <br /> has spread out everywhere.More than grass is needed on the side. The DNR should have a list of plants <br /> that will stop the erosion. Crawdads and other creatures are gone because of the silt. <br /> Chair Bollis closed the public hearing at 6:13 p.m. <br /> Ressler asked if the DNR is in control of the ditch. <br /> Curtis said the area is not identified as protected so it is a City action and a grading permit is required. <br /> Staff does recommend that the applicant remove any material caused by the work done last fall. <br /> McCutcheon said it seems that when there are big road projects there can be adverse reactions and this <br /> seems like one of those situations.He said the residents were looking for more information and asked if <br /> details could be posted for the public. <br /> Curtis said that is done with road projects but this is a private improvement. The City would not be <br /> responsible,but would make sure erosion control measurers were not removed until the plan is executed <br /> and vegetation installed. <br /> Bollis pointed out the application has the review of the City Engineer and several other agencies. <br /> Ressler noted the applicant has submitted a plan that includes everything that staff is recommending. It <br /> would be better to leave this in the hands of the engineers,he said. <br /> Libby said he is in support of the staff recommendations but is grateful for the extra information supplied <br /> by the applicant and the neighbors.He said the Planning Commission does not have the engineering <br /> expertise but that this will be reviewed by the experts.There is significant expertise involved in this. <br /> Tom Major said the Commission has been mainly talking about the project.He questioned what would <br /> happen downstream. He asked who is responsible for maintaining the ditch. <br /> Curtis said staff is recommending any sediment that is a result of the work last fall is the responsibility of <br /> the applicant to remove with permission of the adjacent property owners to enter their property. She said <br /> Page 2 of 11 <br />