My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Memo re building project
Orono
>
Property Files
>
Street Address
>
B
>
Birch Lane
>
3460 Birch Lane - PID: 08-117-23-43-0027
>
Correspondence
>
Memo re building project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:48:22 PM
Creation date
10/8/2015 11:27:05 AM
Metadata
Fields
Template:
x Address Old
House Number
3460
Street Name
Birch
Street Type
Lane
Address
3460 Birch La
Document Type
Correspondence
PIN
0811723430027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Friday, August 03, 2012 11:18 AM <br /> To: 'lisle.steve@gmail.com' <br /> Subject: 3460 Birch Lane <br /> Attachments: Resolution 5258.pdf <br /> Steve, <br /> As we discussed on the phone it appears no variance is needed for your project. Since the deck is already <br /> considered a structure (i.e. structural coverage) because it is at least 6' above grade and does not encroach <br /> into any setbacks a roof is allowed. The new roof must not encroach into the average lakeshore setback or the <br /> 10-foot side yard setback. <br /> In 2004 a variance was granted to allow construction of a larger front stoop including a roof. With the approval <br /> of this variance 102 sq. ft. of hardcover was to be removed. I have attached a copy of the variance resolution <br /> for your records. The hardcover removals are specified on page 3 of 6 and shown on Exhibit A. <br /> Building permits that do not require any grading or engineering review require a $700 escrow. We hold the <br /> escrow until the project is complete and the building inspector has given the final approval. Before we refund <br /> the building permit escrow you will be required to submit an as-built survey, including as-built hardcover <br /> calculations, showing the property is in compliance with the 2004 variance. <br /> Please don't hesitate to contact me if you have any additional questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelly Parkway Orono MN 55356(physical addressJ <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing address) <br /> � 952.249.4620 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 21 through Friday,August 31,2012) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday,September 3, 2012 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.