Laserfiche WebLink
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Friday, August 03, 2012 11:18 AM <br /> To: 'lisle.steve@gmail.com' <br /> Subject: 3460 Birch Lane <br /> Attachments: Resolution 5258.pdf <br /> Steve, <br /> As we discussed on the phone it appears no variance is needed for your project. Since the deck is already <br /> considered a structure (i.e. structural coverage) because it is at least 6' above grade and does not encroach <br /> into any setbacks a roof is allowed. The new roof must not encroach into the average lakeshore setback or the <br /> 10-foot side yard setback. <br /> In 2004 a variance was granted to allow construction of a larger front stoop including a roof. With the approval <br /> of this variance 102 sq. ft. of hardcover was to be removed. I have attached a copy of the variance resolution <br /> for your records. The hardcover removals are specified on page 3 of 6 and shown on Exhibit A. <br /> Building permits that do not require any grading or engineering review require a $700 escrow. We hold the <br /> escrow until the project is complete and the building inspector has given the final approval. Before we refund <br /> the building permit escrow you will be required to submit an as-built survey, including as-built hardcover <br /> calculations, showing the property is in compliance with the 2004 variance. <br /> Please don't hesitate to contact me if you have any additional questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelly Parkway Orono MN 55356(physical addressJ <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing address) <br /> � 952.249.4620 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 21 through Friday,August 31,2012) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Monday,September 3, 2012 <br /> 1 <br />