My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-1989 Planning Packet
Orono
>
Planning Commission
>
1989
>
03-20-1989 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:56:17 PM
Creation date
11/9/2023 1:10:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mir ' ■ ''V ., ^iilP^ <br />)ceed in three general <br />JS <br />)n <br />' phase; however, the <br />j1 capabilities. <br />site <br />g buildings other <br />Point Charming <br />est and southwest <br />layground <br />/shower buildings to <br />Did main dining hall <br />g storage buildings <br />:>idicapped accessible <br />in NE and NW areas if <br />and <br />tanks and fields, and <br />m <br />is'l <br />.. • <br />k «f <br />-A- <br />v=: r;v; •:. --. /■.../ »■: <br />VLUii -x Wn V*:;,4 •..• .• :y-.::-'^ ..m^mm <br />^ 1 <br />-■• .■ ; .-■*■' *l;'- ,:‘ r ■ ' <br />. ■■'' -V 1-: •■ .•••: <br />,v.;:.‘ ^■•v'..: /V''./,m <br />MvMm^mmm :r-iV" '-';: .,i;,I A. •. -= •^::/^‘J ■ if :■ /K: T. Vl§0m^■' ;^::‘‘ ^' ■. :■■ x.:?:' ■ -’■ -a; j>?X ;a-=■: -s-v"' •Project lA Project IB <br />Project 1C <br />Project ID <br />Project IE <br />Project IF <br />Project IG <br />Project IH - <br />Project II - <br />- SE picnic building construction- PD picnic building construction <br />- visitor center renovation - foundation and other re <br />novation - major on-going project <br />- PD latrine/shower building construction <br />building and septic field for 4s and manager's cabin <br />- SE latrine/shower building construction <br />building and septic field for 4s + 10-12 cabins <br />■ NE picnic building construction <br />• NE 1 atr'ine/shower building construction <br />building and septic field (tent camping area) <br />storage building renovation - limited renovation of <br />storage buildings to repair and improve security <br />•IW picnic building <br />Phase 2 - Handicapped Accessible Cabin Construction <br />This phase provides for the construction of ten handicapped accessible <br />cabins in the SE area. Each cabin will be connected to the septic <br />svstems installed in project IE. Refer to attachment for drawing and <br />floor plan. <br />Project 2A - cabin i?! <br />Project 28 - cabin §2 <br />Project 2C - cabin f3 <br />Project 2D - cabin H <br />Project 2E - cabin US <br />Project 2F - cabin #6 <br />Project 2G - cabin §7 <br />Project 2H - cabin §8 <br />Project 21 - cabin #9 <br />Project 2J - cabin #10 <br />Project 2K - handicapped ramp and trail construction <br />improvement of existing hard-su.faced trails and building <br />of sidewalks between cabins and to beach <br />i~7:_rr^.e-- <br />■ ;.:v.-;vV v;i m <br />> ■ • vr,;- ' • <br />0. <br />h!--MIm? <br />' • . • * : : L <br />•■• -r - <br />.-'rf'h. V 1 ••.’ll . k .1.- . <br />"*■ <br />■■:cW^:.
The URL can be used to link to this page
Your browser does not support the video tag.