My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-15-1993 Planning PacketC
Orono
>
Planning Commission
>
1993
>
11-15-1993 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 11:38:10 AM
Creation date
11/2/2023 11:31:55 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File ^1885 <br />November 12. 1993 <br />Page 2 of 6 <br />H - Map of Existing Land Use <br />I - Map of Existing Zoning <br />J - Map of Proposed Land Use <br />K - Plan for Phased Development <br />L - Plan Locating Curb Cuts of Private Roads along Willow Drive <br />M - City ’s Wetland Map <br />N - Highway 12 Corridor Alternative Development Plans Involving County Road 6 <br />O - Sketch Plan <br />Brief Review of Application <br />The applicant seeks to rezone property to a Planned Unit Development with underlying <br />RR-IB zoning. Applicant seeks approval ot one acre density. The property consists of 58.6 <br />acres after the exclusion of the dedicated road right-of-ways for Willow and County Road 6. <br />The code will allow credit for the wetland areas as property will be sewered. The PUD format <br />of development allows for an area credit of the access roads and open space areas along with <br />the area of the residential lots. Based on the 58 lots, the City must be assured that there is a <br />minimum of 29 acres of dr>' buildable area for development e.xcluding all designated or protected <br />wetlands, retention ponds and drainageways. <br />Review Exhibit F. the recommended alternative for development of this area was for two <br />acre single family residential development to be served with municipal sewer and water. <br />Municipal services are located on the north side of Highway 12 at the Willow Drive intersection. <br />The developer would be responsible for extending municipal services north to the subdivision. <br />The developer claims it is not economically feasible to provide municipal services to two acre <br />lot development. <br />The rezoning from two acre to one acre is a major issue for the City as the area was to <br />serve as a buffer to the surrounding rural residential neighborhoods to the east and north from <br />the more intensely developed properties to the south. The applicant has provided a strong <br />argument in support of the rezoning. Lundgren Brothers has asked for the sketch plan and <br />rezoning to be scheduled before the Council be ">re formal plans are tiled by applicant. Staff will <br />review the rezoning issue first. If members object to rezoning and '•ecommend denial, they need <br />not proceed any further with the remainder of memo which will deal with the issues ot the <br />development plan. <br />Rezoning <br />The applicant lias applied for a PUD rezoning at a one unit per acre density. The <br />subdivision is plannee in two phases; the first or southern half to be developed in 1994 and the <br />second phase to be ceveloped in 1995-96. Section 10.53, Subdivision 5 (D), the PUD code, <br />provides additional protection to the City it development has not been realized. Zoning may <br />revert back to the original zoning district.
The URL can be used to link to this page
Your browser does not support the video tag.