Laserfiche WebLink
PLANNING COMMISSION MINUTES <br />CITY OF ORONO <br />NOVEMBER 15, 1993 <br />plan and the site grading and drainage plans He showed graphics illustrating the wetland <br />mitigation proposals. <br />John Uban reviewed the zoning issues and the density they are proposing at one unit per <br />acre. He discussed the site constraints and reviewed the design for the proposed <br />development. He explained how the runoff can be consolidated and retained in one large <br />wetland area by using the natural features of the site. He discussed tree preservation plans <br />and the roadway plan. He stated they believe it is beneficial to put the open space around <br />the perimeter o* the site and cluster the houses together on the interior portion of the site. <br />He discussed the internal roadway systeni and their efforts to preserve the woods. He noted <br />that the site consists of 58 6 acres, and the development occupies 38 acres, which <br />comprises a density of ore unit per acre. In summary, he noted that the proposed <br />development met the PUD ordinance criteria, and they would be creating a quality <br />development. <br />Chairman Schroeder discussed the one unit per acre density and the two acie lot minimum <br />standard. He inquired if it would be possible for the developers to increase the lot size to <br />meet the one unit per two acre density. Mr. Forbord stated that Lundgren Brothers had a <br />specific type of customer in m.;i' * wi tju they designed this development, and projects were <br />designed based on demographics and community profiles. Their customer profile Is <br />significantly different than that of their competitors. He stated they had worked with City <br />staff to design a project that would best suit their potential customers and in this case staff <br />supported a PUD format for develcpment. He noted that the one unit per acre density <br />exceeded the normal density throughout the metropolitan area. <br />Chairman Schroeder commented that the City of Orono has 2-5 acre minimum lot sizes, <br />which exceeds the standards of other communities in the metro area. Discussion ensued <br />regarding the costs involved with extending municipal utilities to the property and the issue <br />of how those costs would be passed on to the buyers of the lots within the proposed <br />development. Commissioner Nolan inquired why septic systems would not be feasible on <br />this site, and Ms. Mabusth responded that a study had been done in the early 1 970's for an <br />earlier subdivision which indicated that no septic systems should be placed on this property. <br />She noted she felt that PUD was the proper zoning designation for this property. <br />The costs involved with extending City sewer to the property were discussed. The issue of <br />the density was discussed, with the Commission concurring tliat the one unit per two acre <br />density was preferable to the one unit per one acre density proposed by the applicant. Mr. <br />Forbord stated that it was not feasible to proceed with the project if that was going to be <br />the requirement of the City. He explained how their costs per lot are always higher than <br />those of other developers. Commissioner Nolan commented he felt there were benefits to <br />clustering the houses within the development, but he was concerned about the density and <br />inquired if the density could be reduced and the project still be viable. Mr. Forbord <br />responded that there was a diversity in what people wanted and he did not believe the