My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-16-1993 Planning PacketC
Orono
>
Planning Commission
>
1993
>
08-16-1993 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 12:12:20 PM
Creation date
11/1/2023 12:06:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File ^1851 <br />August 11, 1993 <br />Pace 3 <br />Isv <br />a.Discharge from water softener shall be discharged through an independent <br />and separate facility in an attempt to minimize impact on pressurized <br />mound svstem. <br />b.Orono Woodlands, Inc. is encouraged to maintain water meter for an <br />indefinite period of time to determine water use at the facility. <br />c.Orono Woodlands. Inc. shall ensure that all heavy equipment shall be kept <br />off the proposed treatment area before and after construction. The <br />treatment area must be fenced off before the installation of the system. <br />-------
The URL can be used to link to this page
Your browser does not support the video tag.