My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-16-1993 Planning PacketC
Orono
>
Planning Commission
>
1993
>
08-16-1993 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 12:12:20 PM
Creation date
11/1/2023 12:06:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m <br />m <br />m*X^4iM <br />.rr-.j <br />5^. <br />•V .'i .' <br />.|v.>; <br />‘ 'i' <br />ly. <br />V‘\ i! ^.9 <br />IJ.>4, . n ■, <br />m0i'^> <br />iW- ‘^;'S|5, <br />*>j <br />^ V <br />•*< r. ifT;* <br />yji V‘*, <br />■’A '' <br />V'i":': <br />ktfci. »*- <br />IL. <br />City of OROrVORESOLUTION 0^ THE CITY COUNCIL <br />NO. .IV. <br />1. Prior to the huulin<j of fill to the site the applicant or <br />applicant’s agent must subn.it the following: <br />a) Six cross sections of existing topography. <br />b) Final grading and Frosion Control plan designating the <br />following: <br />1) Side slopes “S: 1. <br />2) One percent tlope to be maintained within inner fill <br />area. <br />3) Silt fence installed 30 to 35 feet from wetland at <br />9*^2 elevation — no land alterations allowed within 26 <br />feet of wetland. <br />4) Average height of fill to be maintained at 5 feet. <br />5) Monitoring plates to be installed as required by <br />the City engineer. <br />c) Executed Developer ’s Agreement and appropriate security <br />to insure final grading and seeding if fill project is not <br />completed. Letter of Credit must be written for 150 percent <br />of the estimated cost of the improvement. <br />2- Pill shall not exceed allowed amount of 100,000 cubic yards. <br />Side slopes shall be seeded ?s soon as 5:1 slope ratio has been <br />realized. <br />3. ?rrk Construction shall be responsible for advising the City <br />of monthly schedule of hauling activities so that staff can <br />arrange an approximate inspection schedule for each month. Prior <br />to hauling any fill to the site Park Construction must arrange <br />for a preconstruction meeting with the Orono staff to review all <br />final submittals and tentati/e hauling schedule. <br />4. Park Construction shall ceese all hauling to the site upon <br />evidence of shearing and/or other signs of instability created by <br />tilling over the former dump sine. Applicant shall not proceed <br />with hauling until the City Engineer has had adequate time to <br />r‘*view the evidence and submit a written report to the Council <br />for their review and action. It Council determines that it is in <br />the public interest to cease all hauling to the site, this <br />conditional use permit shall be terminated immediately and the <br />applicant t'liall complete the final grading and seeding of the <br />entire disturbed area. <br />5. Authorities granted by tnis resolution run with the property <br />not with the owner, but arc permissive only and must be •"ompleted <br />within one year of the date of Council approval or the special <br />conditions of this resolution will expire on that date (June 8, <br />1988). <br />Page 3 of 5 <br />f'S** * . i* V <br />» V* >
The URL can be used to link to this page
Your browser does not support the video tag.