My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-20-1993 Planning PacketC
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1993
>
09-20-1993 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 12:13:02 PM
Creation date
11/1/2023 12:06:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION MEETING <br />HELD SEPTEMBER 20, 1993 <br />ROLL <br />TheOrono Planning Commission met on the above dale with the following members present: <br />Chair Charles Schroeder, Candace Rowlelle, (.'harles Nolan Jr., Sandra Smith, Stephen <br />Peterson, Janice Berg, Dale Lindquist. The following represented the City Staff: Building & <br />Zoning Administrator Jeanne Mabusth, and Recorder Marva Hurst. Chair Schroeder called <br />the meeting to order at 7:00 p.m. <br />(#1) #1862 THREE STAR TRUCKING <br />2590 WATERTOWN ROAD - PRELIMINARY SUBDIVISION - PUBLIC <br />HEARING <br />The subdivision was reviewed as a sketch plan review at the July Planning Commission <br />meeting. Theapplication involves a proposal within a rural residential district requiring on-site <br />septic testing and the assurance that there is two acres of dry buildable contiguous land within <br />each of the lots. Each lot, with the exception of lot 8, is proposed at the minimum two acre dry <br />contiguous with lot 4 having a .55 acre retention pond. Applicant* alternate plan shows an <br />extension to the west through the Halson ’s property. Applicant's surveyor has shown a dashed <br />line, where the 50 foot extension corridor would be located. Also, with the designation of the <br />road , lot 7\s lot line is moved further east to assure enough dry contiguous. <br />Mabusth noted the updated report from the engineer which should be reviewed during <br />discussion ofgradingand drainage issues because there ares;.!vci al unanswered issues regarding <br />the size of the retention pond in lot 4. Primary concern is that if the pond had to be increased <br />in size, where would the additional dry buildable area come from? The only available <br />additional dry buildable would come from lot 8. <br />Mr. Dunwreath Peasley, 95 Hackberry Hill, asked for clarification of lot locations and raised <br />concerns about draining to east lot line. <br />Chairman Schroeder read aloud the letter from the engineering firm Bonestroo, Rosene, <br />Anderlik & Associates, dated Sept. 12, 1993. <br />Schroeder asked Mabusth to clarify meaning of this letter, <br />Mabusth explained that she is not able to get an accurate sizing of the pond and that Mark <br />Gronberg would have comments and information to share regarding this issue. <br />Gronberg explained his conversation with Shawn Gustafson of Bonestroo et al. They reviewed <br />'he numbers and the possible classifications for woods and pasture: good, fair, and poor. <br />Gusta fson had cla.ssified both wood and pasture as fair but after review he was comfortable <br />with the numbers. They a. o determined that berm was actually higher than the high water <br />mark of retention pond l IvOiC will have to be some type of erosion control at the outlet of the
The URL can be used to link to this page
Your browser does not support the video tag.