Laserfiche WebLink
Zoning File #1821 <br />Mav 10, 1993 <br />Page 3 <br />The original application was withdrawn when applicants pursued the building permit for <br />the new construction and you should be aware that once a subdivision has been commenced, <br />building permits cannot be issued for any new construction until the subdivision has been <br />approved. The former residence on the property (Lot 1) has been demolished. <br />Access <br />As already noted, the access shall be shared via the private driveway cutlot. Note <br />accessory structure is only 5 ’ from lot line Private driveway outlot can be reduced to 25 in <br />width. The City has no required standards for driveway outlot widths. Applicants have advised <br />that 14 ’ X 26.4 ’ addition to the bam can easily be removed and is in a serious state of disrepair. <br />Tliis would reduce the accessory strucnire to 627.9 s.f. requiring only a 10’ setback. By <br />reducing outlot width to 25 ’, structure will meet required 10’ setback. <br />Owners to immediate east had voiced concern that a driveway could be placed so close <br />to a property line. The City has no standards for setbacks for private driveways to adjacent lot <br />lines. In order to provide adequate distance from adjacent property, outlot may remain at a 30 <br />width along the portion that abuts the residence structure to the east and then reduced to a 25 <br />width as it approaches the accessory structure. <br />Please review Exhibit H, the Engineer has recommended that the size of the culvert to <br />be placed under the drive that extends southward be designed by an engineer in order to assure <br />that upstream storage is not increased. Access and utility easements will be taken at a 10’ width <br />along all perimeter property lines. <br />Drainage Issues <br />Review Exhibits D and E, drainage was the major concern during the earlier 1990 <br />review. Specifically, the area along the northwest lot line where drainage originally traveled <br />northward collecting within the northwest comer of property before it drained through 12" <br />culvert. Concern was raised because of the location of the septic site areas proposed for Lot 1 <br />and the need to keep the flooding elevation below the 974.5. Upon applicafion for the new <br />residence, the applicants were required to install a new septic system. If the principal drainfield <br />site was to be used, the drainage improvements had to be completed. Drainage improvements <br />consisted of the plugging of the 12" culvert, the installation of an underground tUe and drainage <br />swale redirecting drainage to tributar>< to the south along the proposed shared lot line. The <br />drainage way must be maintained it the proposed septic areas are to remain contorming. It will <br />be necessary to take a 20’ drainage easement over the drainage way along the west lot line. <br />k