My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-21-1993 Planning PacketC
Orono
>
Planning Commission
>
1993
>
06-21-1993 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 4:18:00 PM
Creation date
10/26/2023 4:11:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
!> <br />7 <br />To: <br />From: <br />Date: <br />Subject: <br />Jeanne A. Mabusth, Building & Zoning Administrator <br />Stephen WecKman, On-Site Systems Manager <br />May 11, 1993 <br />Subdivision <1^1821, Steven Wirtjes - Septic Review <br />Soil testing and system design was submitted for this two-lot subdivision in 1989. Lot <br />1 contains a home which is connected to a conforming septic system with an alternate site <br />available for a 5-bedroom home. Lot 2 has approved soil testing and system design for a 4- <br />bedroom home. The site evaluator, Steven Schirmers, will be reviewing the site to verify that <br />the sites are suitable for a 5-bedroom home. <br />Although Lot 1 has suitable existing and alternate drainfield sites, the poor placement of <br />the well has resulted in sites which do not meet the City’s required 75 ’ well setback. The <br />existing drainfield site is 50 ’ from the well with the alternate site encroaching within 35 ’ of the <br />well. As the State of Minnesota requires that a minimum 50 ’ setback be maintained from the <br />well to a drainfield, staff will allow well in its current location. However, at the time the <br />alternate drainfield site is required for use, the well must be abandoned and located at least 75 ’ <br />from the septic system. <br />Staff will recommend approval of the septic system siting as proposed, provided the <br />above condition is met. Also, both primary and alternate drainfield sites on Lot 2 must be <br />fenced prior to construction. <br />4
The URL can be used to link to this page
Your browser does not support the video tag.