My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-21-1993 Planning PacketC
Orono
>
Planning Commission
>
1993
>
06-21-1993 Planning PacketC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 4:18:00 PM
Creation date
10/26/2023 4:11:36 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• •\ <br /># <br />J s GME CONSULTANTS. INC.I^ll <br />CCNSl^^'NG £V~:N£E0S <br />•4C0C«’*t» V V-I N*N 5544 ' <br />A <br />0ct3c«r l?, lff2 <br />«r. Rcb«rt Ov«n» <br />1700 »or.n Point RO«d <br />Crono, Minn«»ots 55391 CME Project Ho. 37€# <br />RXj ProlialnAry <4«*l9n concopts for ahor* lin# alop® rapair <br />at 17 30 Oonn Point Road in Cnno, Hinnaaota <br />Doar Hr. Ovan#: <br />prasanta tha raavilt# of our fiald aurvayin<j and praliair.arj <br />daaiqn ccncapta for tha ahcra lino alcpa rapair at your houaa at 1700 <br />Bohn Point Road in Orono. Authorisation to pmrtorn this work waa your <br />accaptanca of our contract addandua datad Octobar 9» 1992. This rapor- <br />concludas tha acopa of aarvicaa dascribad in our contract addandua. <br />pToiact PaacriPtioB <br />Ha undaratand that tha alopa along tha Laka Minnatonka aida of your <br />propart’, failad during tha -auperstora* of 1917. In 1988, tha alopa <br />waa rapairad by Outdoor Environaarta, a landacaping fira from ShaKopaa. <br />You atatad tha alopa was ataeilicad by placanant of gaofatone. Tha <br />»iop« wa» r^shapttd ind fill vas placed with a small bulldozer. The <br />fill was comffloii borrow and contained broken piacas of concrata ..roa a <br />rasad baach housa. <br />During tha haavy rains in t.he weak of Saptamfaar 13 through 18, <br />aprroxiaataly 5 inches fall ona night and caused a failure o. tha ai <br />section of t.ha slope. You stated that prior to t.ha failure, the crest <br />of the slope had experienced soaa sattlaaent. During cur site visit on <br />October 8, 1992, wo observed the failed area but did not see any <br />geoffabric protruding fron the exposed slope. You have subsequently <br />learned A. *.om the contractor that geofabric was naJt placed during <br />original slope repair. Also during our visit, we observed a tension <br />crack r’anning parallel to tha crest of tha slope, approximata..y ^ ^ <br />back from t:«dg«. T.his crack traverses almost tha entire length of <br />the slope. You stated that this crack is xocated at the approximate <br />boundary between the fill and t.he natural soil from the initial slope <br />repair. <br />Scope of Services <br />WtLUAM C. XWASNY. PE. <br />GREGORY P REUTEP. PE. <br />.VAR k. 0 MILLSCP <br />THOMAS PAUL VENEMA. PE <br />WYATT A. GUTZKE. PE. <br />SANCRA J. FCRRE3T <br />Art EauBi ODOOrtunity 6?TM3'Oy«** <br />william E. bloemenoalpe. <br />MERVYN MINOESS. PE. <br />STEVEN J. RUESINK. PE
The URL can be used to link to this page
Your browser does not support the video tag.