Laserfiche WebLink
IP' <br />ROBERT H. OWENS <br />1700 Bohns Point Rootl <br />Visytsts. Minnesota SS391 <br />Jure IT. ’^93 <br />Ms. Jeame <br />BciiicSng and Zoning Aoministfatcf <br />Cty ot Ofono <br />P.O. Box 66 <br />Crystal Bay. **^nnesoti £5323 <br />IRE LAND USE APPLICATION Of MAY 27. 1393 <br />Dear Ms. MaCust.n; <br />TTssi Icter will xnSrm Our COrtversaton ccnctfTsng tn« surjs of final design deta'Is. <br />As coveftd in my tetttr to yoy on June 11. 1993. the lake shore dank design by our <br />engineer. GME Consultants, was suorr^rtted to your eng reer and to you last week. The <br />final Geogrd retrfcrcement design was net finished pending ioil test bc.nngs wfiicn have <br />now been completed, final design wiT be completed and sent sy ‘ax to your engineer <br />and yourseif Friday, Jure 18. 1993. <br />As stated earner, after tfss second faHure cf the ban*<, we nave gene to considerabi# <br />expense to irrrestigate and design a permanent repair. Our Consulting Engineers tell ui <br />the combination of retaining wails and GeogrId fabric is the way to accomplish this. <br />Had I understood tr.e requirement fer a Land Use Application and not just a permit, this <br />process would have started months ago and the bank would already be restored. As <br />it now stands, I am very concerned tnt work is completed before more of the bank <br />collapses mto the take. <br />Please call me if you require anything funher. <br />Sincerely,1 <br />^'O <br />I