Laserfiche WebLink
2^onif^ File #1802 <br />February 12. 1993 <br />Page 3 <br />The tollowinf are parking requirements for ocher uses to be conducted within structure: <br />Day nursery ■ 4 I for each 500 s.f. in excess of 1.000 s.f. <br />4.625 - 1.000 - 3.625 s.f./500 - 7 <br />Total spaces * 11 <br />Office Use • I for each 200 s.f. of floor area <br />4.625 s f7200 ■ 23 spaces <br />Coenmunity Center • 10 4- 1 for each 300 s.f. in excess of 2.000 s.f. <br />4.625 - 2.000 - 2.625 s.f./300 - 8.73 <br />Total spaces ■ 19 <br />The application has been reviewed by the Police Chief and he advised that the parking <br />should be increased as the area is used for overflow parking for school activities. He also asks <br />that curved median areas in parking lot be physically defined by curbing rather than just striping <br />He asks that basketball court area be relocated out of dnving lane <br />Please review Exhibit J Gusufson t»tes 'the sidewalk aloi^ the building is proposed <br />to be a raised concrete surface that will provide a curb for the parking lot in those areas*. Fi>r <br />the portion of the north end of the parking lot that is not adjacent to the sidewalk, he <br />recommends curbing be installed. He notes that there are other alternatives if concrete curb <br />cannot be insulled. Prior to the parking lot being repaved and striped, applicant shall provide <br />a final grading plan showing grades and typical sections for both parking lot and drainage swales <br />if they are to be installed. <br />Review Exhibit K. Ihe property is located within the areas of the City’s comprchcmivc <br />bike trail plan on Old Crystal Bay Road. The City will ask for easements to install bike trail <br />at an approximate 8’ width locat^ 21’ in from street lot line The approximate wklih of the <br />easement would be 10’. The C*ty will require temporary commiction easements. Gusufson <br />advises that one small pine tree will be removed and transplanted within the immediate area. <br />The specific location of the trail setback has been approved because there is an opening in the <br />trees along the north lot line. The City will ask the school to grant the 10’ casement and <br />necessary temporary construction casements for the bike trail. <br />Per Section 10.61. Subd. 5 (A), setbacks for parking fronUstrect setback <br />Required * 50’ <br />Proposed ■ 40’ <br />A single parking sull livated within front street yard setback area must be relocated. <br />The loading area defined on site plan as trash and recycling area to the cast side of <br />strucrure is shown at 12’ x 20’ and should oc enlarged to 12’ x 25’.