My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-1993 Planning Packet
Orono
>
Planning Commission
>
1993
>
02-16-1993 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 2:54:39 PM
Creation date
10/25/2023 2:51:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.f <br />^4 ^ J <br />'ft <br />»• <br />STATEMENTS OF PROPOSED HARDSHIPS <br />The Runyan/Vogcl Group, Inc. Architects <br />Sherman Residence - Lot #5. Marsh at Lafayette <br />Hardship iii <br />”Mansa/tl* roof versus a "Gabtod’ roof: The definition of building height. Section 10.02 Ittm <br />#13 o4 the adopted City budding ordinance docs not ckarty define the term ‘mansard*. <br />• The total building height of a ’gabled* roof building is defined b>; mcasunng 30'-O* from <br />the lowest grade elevatioii to the midpoint or the average mean point of the roof, see plate <br />95. <br />• The total building bdght of a "mansard* roof building is defined by meisuruig 30'-0* from <br />the towea grade elevation to the deck of the root, see plate #4. <br />Hardship: The definmon of building height becomes a non-issue <br />when the proposed building is setback 267' from Old Beach <br />Road, see site section plate #2. The driving for« behind Ua <br />of this setback IS to locete the proposed building <br />where the best known soils exist » support a built improvement, <br />see plate #1. The total height of the proposed d«ign would be <br />perceived as lower than any otlar existing adjacent strucrures. <br />Please note, the building pads located on plate #1 are city <br />approved and are recorded on the plat documents. The building <br />pads and finish floor elevatioQS were established by recorded soil <br />TOnngs which determined the most suitable, buildable soils above <br />the floodplain cles'atioo for each lot. All basement floor <br />elevations arc to be a minimum of 2'-0* above the established <br />floodplam elevatioo of 931.5. For this reason, the first floor <br />elevation of the proposed building on Ia 4 #5 is 3'-0* above ^ade <br />and the residence is therefore "lifted" out of the ground. Sec <br />dimensions on plate 92.
The URL can be used to link to this page
Your browser does not support the video tag.