My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-1993 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1993
>
02-16-1993 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 2:54:39 PM
Creation date
10/25/2023 2:51:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
»*1NUTE8 OF THE ORONO PLAMNING 00NMI8SI0N MEETINQ <br />HELD FEBRUARY If93 <br />ZONING FILE 91902 - OONT. <br />Nafutth •xplaintd tna applicant •••kt approval of a conditional uta <br />psrnlt to parMit th# addition to tha axittinj day cars structura <br />to allow axpanaion for tht latch kay programs. Sha notad tha church <br />Mill continue to usa tha structura on Nadnasdays and Sundays. Sha <br />noted sooe corrections to the plans: the School District will not <br />construct a new perking area but will expand on the existing, and <br />no drainage swales are proposed. All improveoients on the site meet <br />the 50* setback frois all property lines. The City Engineer has <br />asked for raised curbing along the north side of the parking lot. <br />She noted there will be no change (n current drainage pattern. She <br />reviewed the landscape plan for the property. She noted the City <br />will reQuest an easement for the bike trail that intercedes <br />property within 500* of the street setback area. Sha explained how <br />the parking lot Is used for over~flow parking by the School for <br />special events, and the Police Chief has indicated he would like <br />the parking area expanded to 50 or 50 stall capacity. <br />Bellows stated this project is pert of an over-all concept for tha <br />campus ares. She agreed with the Police Chlaf that the additional <br />perking Is an appropriate reauest. <br />Habusth noted the Police Chief was pleased to see the addition of <br />lighting. She explained the School will be using the some size <br />signage as approved for the church. <br />Lawson explained the School District feels the parking area does <br />not need the additional parking, and notad Its activitlas will <br />never coincide with that of the Church's. He felt the addition <br />would not facilitate a larger congregation. He reminded them that <br />the School District does own the SO-*-/- acres to the north and <br />additional parking could be supplied at a later date on that <br />property. <br />Rowlette said sha Is concerned about the semi-circle proposed to <br />direct traffic. She Questioned if the area will create a traffic <br />problem. <br />Habusth stated this design Is similar to the driveway layout used <br />on the scnool campus and involves one way directional lanes. She <br />would recQoxsand tho same for this site. <br />Rowlette expressed concern about the design of the parking area. <br />Bellows noted this is an <br />whi'e driving. <br />ares that you want to slow people down <br />1 <br />'id
The URL can be used to link to this page
Your browser does not support the video tag.