Laserfiche WebLink
c. <br />3 <br />■C^ <br />. O' <br />tan <br />• • <br />August 31. 1994 <br />An outline of the proeejures and materials to be used for alterino and <br />restoring approjiroately 7.5 aeres of wetland on the Uriiee Dayton property <br />in Orono <br />The following outline defines work which will be done to create open water in this existing <br />wetland. Nearly all ot ttw work will be done from within the excasation zone, tlierebv limiting <br />disruptmn to the surrounding natural area. Detailed constriictam drawings of the dikJ .structure <br />are yet to be developed, but will be pro\ ided to accompany working specillcations. <br />1 he project will include the following: <br />A. sSile Preparation: <br />1. During October or November ot 1994, a contrt>lled burn using appropriate <br />procedures, equipment and peniiits will be implemented. <br />2. IZro.sion silt tencing will be placed around all areas designated for excavation, <br />deposition or construction traffic. <br />• X <br />U.Cutisf ruction: <br />Wayzat^ <br />Country <br />During the w inter of 1994-95. excavation and transport of the organic soils w ill be <br />done. I he specific equipment and processes to be used remains undefined at this <br />lime. <br />During May or June of 1995. the primary dike will be built. Driveway <br />reconstruction may also occur during this time. Again, working drawings and <br />specifications remain undefined. <br />C. Restoration: <br />Seeding will be done during the spring ot 1995. All disturl'ied areas above water <br />will be seeded with seed collected from the adjoining natural areas at a rate of one <br />pound per lUOO square feet. <br />Individual seedling plants will be added to the seeded areas at a rate of 1 per 10 <br />square feet. The species used will be chosen from the Ibllowing list of <br />possibilities. <br />i y-