My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
09-19-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:28:31 PM
Creation date
10/19/2023 3:19:52 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2^ning File #1958 <br />August 8, 1994 <br />Page 4 <br />on which the various boarded up structures and current rental residence are to be removed. <br />Applicant may be allowed to keep residence at 3877 Shoreline Drive until building permit is to <br />be issued for new construction on Lot 1 but the structures located now within the newlv <br />proposed shared lot line must be removed as a condition of this subdivision approval. <br />Riparian Use <br />The three lots each have had residential docks. The two new'ly proposed lots will each <br />be allowed a residential diKk. <br />Municipal Sewer <br />Refer to Exhibit I, it is not clear from the information submitted with the plat if the City <br />has ever obtained easements over the multiple sewer lines that intersect the property. These <br />lines must be shown on the plat and dedicated to the public if easements have not been granted. <br />Recommendation <br />To approve the lot line rearrangement of the properties IcKated at 2405 Dunwoody <br />Avenue aiKl 3865/3877 Shoreline Drive, subject to the following conditions: <br />I. Upon approval of the subdivision, applicant shall be responsible for the removal <br />of the existing structures located on the newly proposed lot line. Planning <br />Commission to make a recommendation concerning the required deadline for the <br />removals of the two structures. <br />a. Prior to the formal approval of the plat/final plat; or <br />If applicant wishes to remove after final plat approval, applicant must <br />execute a Subdivider’s Agreement and post the necessary Letter of Credit <br />to assure that structures are removed within a reasonable period of time. <br />b.Structure on Lot 1 may remain until building permit is to be issued for <br />new construction or must be demolished at the time structures are <br />removed on Parcel B. <br />2. <br />Developer shall apply for the required demolition permit for houses and <br />detached garage. <br />Upon application for building permits for redevelopment of these properties, <br />builder shall provide detailed grading and drainage plans to be reviewed by the <br />City Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.