My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
08-15-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 4:01:06 PM
Creation date
10/18/2023 3:53:03 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JQ0g4)ZQ-^^gc^■>ii!o6g ua. a. SG< *: Q ^iQaamS <br />I <br />■? <br />9 <br />TO:Jeanne A. Mabusth. Building & Zoning Administrator <br />FROM: Stephen Weckman, On-Site Systems Manager <br />DATE:August 3, 1994 <br />SUBJECT: Application #1951, Kendrick Melrose - Septic Review <br />The purpose of the septic review is to determine whether the proposed addition to the south side <br />of the existing house will affect the existing septic system as well as the future dramfield site. <br />The existing and future drainfield sites are several hundred feet north of the existing house and <br />will not be affected by the proposed addition. The addition is a family room which wil no <br />affect the wa'er usage within the residence and is not near the existing system or the future <br />drainfield site. <br />Based on the above infonnaiion. the home addition will not affect the existing sewage treatment <br />system, nor will it affect the future drainfield site. <br />9 <br />•O <br />•-4 <br />Vw <br />9 9 <br />• • at <br />l.i <br />11 <br />I <br />I <br />I •
The URL can be used to link to this page
Your browser does not support the video tag.