My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-1994 Planning Packet
Orono
>
Planning Commission
>
1994
>
07-18-1994 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2023 3:38:54 PM
Creation date
10/18/2023 3:34:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
XflNTTES or THE CITY OF ORONO PL.\NMNC. COMMISSION <br />MFFTING HELD ON JLINE 20. 1994 <br /><#6> #1939 TLMOTHY OTTKN. 425 TLRNHAM ROAD - VARIANCE - PUBLIC <br />hearing (CONTINUED) <br />Tim Ouen discussed the plans tor the garage and noted he plans to add trees along the «.ast side <br />of the garage to provide more buttering trom adjacent properties. <br />It was moved bv Smith, seconded by Nolan, to recommend approval of #1939 Vari^ance tor <br />Timothv Otten. at ^25 Turnham Road, including landscape screening on the east side ot tne <br />garage as recommended by staff, and this is to be installed within one year trom the date ct <br />building permit issuance. Ayes 7. nays 0. <br />(#7) fl940 KEITH J. SPENCER. IS ORONO ORCHARD ROAD NORTH - <br />CONDITIONAL CSE PERMIT/VARIANCE - PI BLIC HEARLNG <br />Ktiih Spewer »as present. Chair Schroeder noted that the Certificate of Mailing and the <br />Affidavit of Publication were t.n file with the City. Mabusth reviewed the propel. Chair <br />Schroeder read a letter regarding the disposal of material from ihe wildlite pond trom -iiy <br />Engineer Shaun Gustafson. He noted the City should obtain a construction schedule trom the <br />applicant. <br />Keith Spencer stated thev plan to use hay bales as a means of erosion control while the dredging <br />is underway. Lindquist inquired how long the process would lake and Spencer resjwnded he <br />would have it completed within 30 days from the time consinictton commenced. Discussion <br />ensued regarding waierfov l nesting areo^ and Peterson asked if the applicant * tten ^ <br />construct an island in the pond for that purpose. Spencer responded that he dia not intend to <br />construct one. <br />Drainage in the area was discussed. The soils and amount of water in the area were di^uSKd <br />and concern was expressed regarding ihe poieniial for equipment getting stuck and ™«d in he <br />wetland. The restoration process was discussed and the Planning Commission lell that a <br />consituciion managemem should be included in an approval. The Planning Commission also lelt <br />that a letter of credit should be posted until the construction was completed to ensure that the <br />streets were kept free of mud and debris from the dredging operation. <br />h was moved bv Nolan, seconded by Smith, to recommend approval of ^mO Condilional Use <br />Permit/Vatiance for Keith Spencer at 25 Orono Orchard Road North subject to the live <br />stipulations included in the staff report and the following additional stipulations: <br />6 A construction managemem plan shall be submitted for staff review and approval prior <br />' to issuance of the permit. Streets shall be kept clean during the construction process. <br />7. <br />8. <br />The entire project shall be completed within 90 days from the date of commencement. <br />The applicant shall submit a Utter of Credit in the estimated amount of restoration of <br />the area.
The URL can be used to link to this page
Your browser does not support the video tag.