My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-16-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
10-16-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 8:10:33 AM
Creation date
10/13/2023 3:07:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR-Higher Standard Alternatives: <br />• Tiered permitting for new walls: <br />• Administrative Permit* 4 walls are at least 50-feet from the OHWL; and less than 3 feet high, less <br />than 25 feet in length; and on a slope less than 12%. <br />• Conditional Use Permit* 4 walls <50 feet from the OHWL; or over 3 feet high & over 25 feet in <br />length; or on slopes greater than 12% <br />• Administrative approval for expansion of non -conforming structures (i.e. walls) not <br />meeting OHWL setbacks, if: <br />• The wall is more than 50 feet from the OHWL; and <br />• Overall site hardcover is met/conforming; and <br />• Property owner agrees to restoration/establishment of a riparian buffer for 80% of shoreline <br />width with a minimum depth of 10 feet to include trees, shrubs, and natural ground cover. <br />• Additional information: <br />• Individual boulders >30" diameter are considered a retaining wall. <br />• Vegetative screening is required for all walls. <br />*Engineered plans may be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.