My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-2023 Council Packet
Orono
>
City Council
>
2023
>
09-11-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 3:23:50 PM
Creation date
10/10/2023 3:22:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prepared By: Reviewed By: AMC Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to award the Tonkawa-Partenwood Forcemain <br />Replacement Project. <br /> <br />2. Background. In January of 2022 Council approved the design of the Tonkawa Force Main <br />replacement project. The project was awarded on July 10, 2023 to Bituminous Roadways, Inc. <br /> <br />3. Scope. <br />a. Project Scope. The project includes the replacement of 1630 feet of Sanitary Forcemain along <br />Tonkawa Road and 1500 feet of forcemain along Partenwood Road. <br />b. Change Order Scope. The change order includes the removal and replacement of the dual pump <br />manifolds wyes on both lift station 27 and lift station 29. <br /> <br />4. Cost. The change order results in a cost of $6535.00 <br />Who Work Cost Status <br />Bolton &Menk, Inc Design and <br />Engineering <br />$ 73,000.00 Not to exceed, previously <br />approved <br />Bolton &Menk, Inc Construction <br />Oversight <br />$ 10,000.00 Not to exceed <br />Bituminous Roadways <br />Inc. <br />Construction $ 738,847.00 Awarded <br />Bituminous Roadways <br />Inc. <br />Change Order 1. $6535.00 <br />Total $828,382.00 <br /> <br />5. Funding. The forcemain replacement project will be funded by a combination of the sanitary sewer <br />fund and ARPA funding. The projected 2023 year-end balance for the Sewer Fund is $1,176,080. <br /> <br />6. Staff Recommendation. I recommend approval of the change order. Both were uncovered early in <br />the project and were found to be suffering from corrosion. <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to approve Change order #1 for the Tonkawa Forcemain Project in the amount of $6,535.00. <br /> <br />Exhibits <br />A. Change Order1 <br />Item No.: 7 Date: September 11, 2023 <br />Item Description: Tonkawa-Partenwood Forcemain Replacement (22-021) – Change <br />Order 1 <br />Presenter: Adam T. Edwards <br />City Administrator/City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.