Laserfiche WebLink
AGENDA ITEM <br />Prepared By: NAN Reviewed By: LLO Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. This application is regarding variances from lot size, lot width, hardcover and rear yard <br />setback for the construction of a new home. <br /> <br />2. MN§15.99 Application Deadline. The application was received July 17, 2023 and considered to be <br />complete on July 31, 2023. Therefore the 60-Day review period expires on September 29, 2023. <br /> <br />3. Background/ Summary. The applicant is proposing to demolish the existing home and construct a <br />new home on the lot. The subject property is substandard in size and width for the LR-1B Zoning District <br />and is currently nonconforming as it relates to average lakeshore setback, 75-foot lake setback, rear yard <br />setback and hardcover. The applicant is proposing to construct the new home farther from the lake and <br />therefore will bring it into conformance as it relates to the average lakeshore setback and 75-foot lake <br />setback. The proposed home will require a rear hard setback to maintain a setback of 28.1 feet where 30 <br />feet is required. The project will also reduce hardcover from 28% to 27.2%, which is still over the <br />maximum of 25%. The applicant is requesting variances from lot size, lot width, rear yard setback and <br />hardcover. The practical difficulties listed by the applicant include the substandard lot size and width and <br />existing conditions of the site. <br /> <br />4. Planning Commission Vote and Comment. On August 21, 2023, the Planning Commission held a <br />public hearing. The Commission reviewed the application and noted the site constraints of the lot and that <br />the new home will be in compliance with lake setbacks and that the property will have a reduction in <br />hardcover. The Commission voted 5 to 0 on a motion to approve the requested variances as applied. <br /> <br />5. Public Comment. The applicant has provided neighbor acknowledgment forms. A neighbor voiced <br />support of the project at the public hearing and brought up construction timing concerns. The applicant <br />stated that there will be communication with the neighbors regarding construction and trucks. No other <br />public comment has been received. <br /> <br />6. Staff Recommendation. Staff recommends approval. <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to adopt Resolution No. 7400 <br /> <br />Exhibits <br />Exhibit A. Draft Resolution No. 7400 <br />Exhibit B. Proposed Plans <br />Exhibit C. Draft PC Minutes 8/21/2023 <br />Exhibit D. PC Staff Report 8/21/2023 <br /> <br />References <br />PC Exhibits 8/21/2023 <br />Exhibit A. Application <br />Exhibit B. Practical Difficulties Form <br />Exhibit C. Proposed Survey <br />Item No.: 14 Date: September 11, 2023 <br />Item Description: #LA23-000039, Eugene Dobkin, 1380 Rest Point Road Variances – <br />Resolution No. 7400 <br />Presenter: Natalie Nye <br />Planner <br />Agenda <br />Section: <br />Consent Agenda