Laserfiche WebLink
CITY OF ORONO <br />JULY 1995 <br />PROPOSED AMENDMENT; <br />COMPREHENSIVE SEWER POLICY PLAN <br />MUSA BOUNDARY <br />O Cover letter <br />O Application (Standard format) <br />O Supporting documents: <br />I. Map 1 - Proposed MUSA Inclusions <br />Maps 2-1 1 - Individual Neighborhood Maps <br />II. Analysis of Need <br />A. Existing Septic Systems Inventor/ & Analysis <br />1. Overview of Problem <br />2. "Nonconforming" vs."Failing" Systems <br />3. Evaluation Methods <br />4. Individual System Data By Neighborhood <br />5. Summai7 of Results and Prioritization <br />B. Alternatives Considered <br />1. Identification of Alternatives <br />2. Analysis of Alternatives <br />3. Conclusion <br />C. Orono Schools and Hockey Arena Site <br />1. Map 12 - Orono Schools Campus <br />III. Existing and Projected Flows <br />A. Map 13 - Interceptor Service Areas and Intercommunity Connections <br />B. Flow Projection Data <br />1. Sewered Households 1995/2000/2010 <br />2. Sewered Employees 1995/2000/2010 <br />3. Sewered Population 1995/2000/2010 <br />4. Residentidl Equivalent Connections (REC's) 1995/2000/2010 <br />5. Projected REC’s and Sewered Population 1995-2000 <br />6. Projected Wastewater Flows 1995/2000/2010