Laserfiche WebLink
f Awy (Tmintry Club <br />Imtial meeting was July 12. A second neighborhood meeting was requested by Gloria Swanson, <br />which was held in the Council Chambers on September 27. About 60% of the neighborhood was <br />in attendance. They have scheduled another meeting in the Council Chambers for October 25, at <br />which time I expect they will finalize a position letter to the Ccnincil. Additionally, they have <br />requested a«l staff has committed to doing conformity inspections for the entire neighborhood the <br />2nd and 3rd wedts of October so they can make informed decisions. I anticipate they w ill request <br />a sewer project if financial assistance can be provided, and they seemed to concur that both North <br />Long Lake and Long Lake Country Club should pay the same assessment. <br />We have received one letter, that from Gloria Swanson (attached). <br />Qrono Orchards <br />We have had almost no contact from the Orono Orchards neighborhood. Initial meeting was July <br />20. My sense is that, given the information presented them at the meeting, they are expecting the <br />City to come back in a few years with a proposal for a sewer project and City tinancial assistairce, <br />and they may feel there is no more action to be taken. We have received one letter, from <br />Matthew Nicoll (attached). There are a number of systems in bad shape which may not last 5 <br />years... <br />Bay Ridge <br />Initial meeting was August 3. At that time we had included the Hartwood (Pink Palace area) <br />neichborhood as an option. We have not heard trom Hartwood except for the Head s, who are <br />down below the tracks near the channel, and they are aware that Hartwood has not resptmded. <br />However, the 8 Bay Ridge neighbors at the urging of Urban Kerber held a meeting in the <br />neichborhood September 20 which 1 attended and was wined, dined and grilled. The ’grilling’ was <br />quite productive in answering many of their questions. Subsequently, Glenn Cook and I met with <br />them in respoase to their request for locating the sewer lines in their lakeshore yards rather than <br />the street, which seems quite feasible. <br />I anticipate receiving a unanimous request for sewer from Bay Ridge in the near future, <br />conditioned on the lake side location. They may request some financial assistance given the nearly <br />$19,000 unit cost, although I didn't offer them much hope considering there are other <br />neighborhocxls with greater needs.