Laserfiche WebLink
Zoning File #2086 <br />November 15,1995 <br />P^e4 <br />Review Exhibit H, this specific ^^•etland encroaches seven properties. It other property owners <br />seek to dredge open water area within this same wetland system, we would expect each owner <br />to mitigate equal areas of Tvpe 2 for the area of dugout. Any proprerty owner seeking to make <br />similar alterations wxjuld have to have a minimum 2 acres ot dry contiguous lands within their <br />lot. <br />Issues for Consideration <br />1. Applicant hns provided no information as to the method of excavating the pond. The <br />City will not approve the bulldozer approach but would require a scoop method <br />whereby only the area to be excavated is encroached upon. Topsoils, as the Engineers <br />report requests, would be used to spread within the disturbed area to allow tor the <br />renim of the cattails. What other issues should be addressed by applicant or applicant's <br />contractor with this land alteration? <br />2. Should the mitigation area be equal or greater to the open water area ... or should the <br />City require mitigation? <br />3. The City will recommend that the guidelines set out in the City Engineer's report and <br />the DNR handout be followed as closely as possible. Applicant's amended plan should <br />address the following guidelines, side slopes, irregular shoreline and location of <br />mitigation area. Applicant's sur\eyor to confirm that there is no impact on adjacent <br />properties with the expansion of the designated wetland at either the southeast or <br />southwest comers of propert>\ <br />4. Has applicant convinced members of the need for the open water area within the <br />designated wetland (review Exhibit D)? Do members perceive of conflicts with future <br />requests for open water areas within this wetland? <br />5. Other issues raised by Planning Commission. <br />Any recommendation of approval must include the following conditions: <br />a. <br />b. <br />Prior to scheduling the application before the Council tor final action, the City <br />must be in receipt of written comments from both the Corps of Engineers and <br />the Watershed District concerning this application. <br />Prior to scheduling the application before the City Council, applicant must <br />provide an amended plan following the guidelines set forth by City Engineer and <br />DNR. The plan is to reflect mitigation area if recommended by the Planning <br />Commission.