My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-1995 Council Packet
Orono
>
City Council
>
1995
>
12-11-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 3:21:44 PM
Creation date
10/6/2023 3:16:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rr r i ♦MINUTES OF THE REGULAR ORONO CITY COUNCIL <br />MEETING HELD ON NOVEMBER 27, IffS <br />(#I - Assessment Hearing - Willow Drive North - Continued) <br />Ifcirr asked whoe Orooo Plaza property is located and the acreage comparison between <br />the two com. lerciai properties Gustafson pointed out on a map the nonhwesi quadrant <br />of Hwy 12 anc W'lllow wliere the Orono Plaza propert>‘ is located Rice said the Orono <br />Plaza propertv’ consists of 56 acres but was unaware of the amount ot acreage for the <br />Often property, which he did say was smaller in ms. <br />Callahan tnfomwd the public of the letter received from Otten v oicing his opposition to <br />tl» assessment. <br />Jabbour said the street was designed as it is because ot the commercial properties, and <br />some improvements that were made would not, otherwise, be needed. Gustafson <br />explained that as part of the Hwy 12 reconstruction project, the semaphore w as matched <br />with the traffic to the south A right lane was added to direct traffic to the east to the <br />Otten property, made wider, and for >"ear-around use to withstand the weight of trucks <br />using the commercial properties. Kelley added that the roadway was designed to <br />accommodate the future service road servicing these properties Gustalson said a median <br />would be built to line up vrith the frontage road also Gustafson said the road design was <br />such to handle the increase of traffic benefiting the commercial properties which, <br />otherwise, would not have been needed <br />Cliff Otten. owner of the other commercial property-, arrived at this time He noted that <br />his letter stipulated a starting time for the hearing of 7 00 p m , which he showed to the <br />Council Let it be noted that the affidavit of publication showed a starting time of 6:45 <br />pm <br />Otten said he spoke with Moorse about the assessment He was informed that the <br />assessment amount was 25®/o of the total cost Otten said he does not receive 25% of the <br />benetit of the project He added that Willow Dnve w as the only nonh-south link and <br />only through street maintained in the area Otten said Moorse had informed him that the <br />rest of W illow Drive would be improved at some time with no assessment Moorse was <br />reported to have said the other project would not be as extensive and would require <br />overlays about every five years Otten said if this is true, the cost of additional overlays <br />over a period of time would reach that of the improvement under discussion. <br />There were no additional public comments, and Callahan closed the public hearing.
The URL can be used to link to this page
Your browser does not support the video tag.