My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-1995 Council Packet
Orono
>
City Council
>
1995
>
12-11-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 3:21:44 PM
Creation date
10/6/2023 3:16:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #2085 <br />November 17, 1995 <br />Page 7 <br />The DNR has provided a separate ’'make ready dock" aw^y from the ramp <br />area as w'ell as a boat beaching area, to assist in traffic flow at the ramp. <br />DNR proposes to do shoreline stabilizatioD where necessary on the site. <br />The DNR has been proacti\e in dealing with fuel contamination cleanup at the <br />site as well as dealing appropriately with e.xisting wells, toundation removal, <br />sewer line capping, etc. <br />The City has expressed concern as to the impact of this site on the neighboring <br />marinas. Note that the proposed access ramp will be appro.ximately 200' west <br />of Lakeside Marina ’s ramp area, therefore minimizing boat traffic conflicts. <br />The final issue addressed during previous reviews is operation and <br />maintenance of the site. DNR will be responsible for maintenance of this site, <br />although there is the possibility of an agreement with the County for certain <br />maintenance aspects. Note that it is the goal of the City that the Maxwell Bay <br />Access will relieve pressure on the North Arm Access and potentially eliminate <br />the amount of time spent by Orono Police on trafllc control during peak use <br />periods. The Cit>’ has also e.xprcssed concern that winter use of the site is not <br />intended, is potentially risky with the location near the channel and adjacent <br />marina which may "bubble" all winter. <br />Items fur Consideration <br />1. <br />3. <br />Have all concerns of the public and Planning Commission regarding this access been <br />suitably addressed? <br />/\rc there specific issues which the DNR should address before presenting this proposal <br />to the City Council for final approval on December 11? <br />Are there specific site plan concerns in regard to any of the following major topics <br />discussed above: <br />OlT-site traffic accommodation. <br />On-site traffic accommodation. <br />Landscaping. <br />Stormwater control. <br />Fishing pier. <br />Amenities. <br />Operation and maintenance. <br />Other.
The URL can be used to link to this page
Your browser does not support the video tag.