My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-1995 Council Packet
Orono
>
City Council
>
1995
>
12-11-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 3:21:44 PM
Creation date
10/6/2023 3:16:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Request for Council Action continued <br />page 3 of 5 <br />December 7, 1995 <br />Zoning File #2085 <br />• Landscaping to include 37 new 165 shrubs, designed to prcser\e certain <br />existing trees. <br />planning Commission Comments/Recommendation <br />Planning Commission reviewed the site plan and landscaping plan on No\ ember 20, and discussed <br />various aspects of the site plan as well as operation and maintenance issues with Larry Killien and <br />Stan Linnell. Planning Commission noted the extensive review conducted by the Lake Use <br />Committee, as well as input from Maxwell Bay residents. A number ot residents were in attendance <br />at the November 20th meeting and made a number of general comments which Planning <br />Commission requested staff to for%vard to the City Council. The public comments are detailed in <br />the minutes of November 20th meeting, and are briefly summarized as follows: <br />Will a stop sign be placed at the exit on to Tonkawa? (Yes) <br />Will residents be informed of further fuel contamination if encountered? (City will <br />be notified) <br />How does this access compare to North .Amt? (Slightly larger, better traltic flow) <br />- Are there plans to improve Boy Scout Bridge? (No^ <br />• Concerns regarding how the turn lane will lunctici.. <br />» Concerns regarding amount and flow ot traffic during peak periods. <br />Concerns about enforcement ot speed limit on Tonkawa. <br />Access from site to Crystal Bay? (None will be provided, but may be difllcult to stop <br />snowmobilers from crossing between Ma.xwell and Cry stal Bay at this location. e\en <br />though it is probably an unsafe location) <br />Concerns about public fishing overflowing to private shoreline and docks, its well as <br />auto traffic using private driveways. <br />Stoplight proposed? (No) <br />Concerns about w inter use. especially fish houses (Intent is that access not be open <br />in winter) <br />Planning Commission noted that because the DNR is exempt from local zoning requirements and <br />because this is technically a public information meeting, no formal Planning Commission action is <br />required. However, Planning Commission indicated general approval of tlte project, noting that the <br />DNR has substantially addressed all site planning concerns and issues raised by the Lake Use <br />Committee during its review. <br />Site Operation and Kelaivo <br />In their letter of September 6, 1994, DNR addressed a number of operation and maintenance <br />concerns The DNR will provide for general operation and maintenance of the site, which includes <br />such items as litter pickup, mowing, tree trimming, etc. The DNR will also take responsibility for <br />any major maintenance needed on the site. Enforcement of the site shall be a cooperative effort <br />between the City, County and the DNR.
The URL can be used to link to this page
Your browser does not support the video tag.