My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-1995 Council Packet
Orono
>
City Council
>
1995
>
12-11-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 3:21:44 PM
Creation date
10/6/2023 3:16:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
509
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNCIL MEEHNG <br />REQUEST FOR COUNCIL ACTION DEC 1 1 1995 <br />DATE: 9Fn(h(^0||eKO <br />ITEM NO,IC <br />Department Approval: <br />Nanu Jeanne A. Mabusth <br />Title Building & Zoning Administrator <br />Administrator Reviewed:Agenda Section: <br />Zoninu <br />Item Description: #2082 Richard Siark.575 Oxford Road - Vacatioa'After-the-Fact Variances <br />Resolutions <br />Brief Review of Application <br />Please refer to the staff memo dated November 14. 1905 and the Planning Commission minutes of <br />the November 20, 1995 meeting for more detail and background on this review. <br />Applicant (purchsed property in August 1995) had no knowledge of a Conser\ ation & Flowage <br />Easement as former owner and title company had never noted its existence. The designated wetland <br />protected bv the easement covered all of applicant's lakeshore yard (refer to Exhibit K). Applicant <br />proceeded to remove trees within the 0-75' setback area and within the protected area under the 1978 <br />Conser\ation Easement created at the time of Stielow Addition. <br />The Building Inspector discovered the violation in a routine inspection of the neighborhood and <br />advised applicant's contractor to cease all work until necessarx ’ approval had been obtained from the <br />City. The zoning staff and City Engineer have met with Mr. Stark on at least two occasions. We <br />discussed the need to install erosion control and inspected the originally defined protected area to <br />determine if a wetland truly existed within the boundaries of the protected aiea of the Conservation <br />Easement After inspecting the lakeshore yard, staff concuired that the original wetland designation <br />may have been ov erly generous. Applicant was advised to hav e a wetland delineation made of the <br />area to deiemiine the exact boundaries of the true wetland. <br />Refer to Exhibits G. H and J, the delineation report was reviewed by Gustafson who confirmed the <br />findinus and approved the redesignation of the wetland. Applicant was advised to immediately <br />install'suiiable groundcover over the nonwetkuid area and to plant appropriate wetland seeding such <br />as Ma Dot mixture 250 in the wetland area. <br />The City staff have inspected the area and confirmed that certain plantings within the wetland have <br />taken and ;he Engineer will reinspect the properly in the spring to detemiine if other wetland seed <br />types have also surv ived the winter. <br />Refer to E.xhibit F, 10 trees were removed in the 0-75’ setback area. 10 trees within the area defined <br />as A (newly defined wetland area not included in the 0-75' zone) and approximately 12 trees in the
The URL can be used to link to this page
Your browser does not support the video tag.