Laserfiche WebLink
MINUTES OF THE REGULAR ORONO CITY COt'NCIL <br />MEETING HELD ON OCTOBER 2J, 1W5 <br />OTY ADMINISTRATOR’S REPORT <br />(#11) OVERLAY TO END OF WILLOW DRIVE <br />Moor sc provided the Coonc:i members with a spread sheet on MSA budgeting for <br />roadway improvements. Staff has suggested doing an overlay project on the north end ot <br />Willow in conjunction with the Willow improvement projea in order to use MSA funding <br />for the $32,160 50 cost Moorse reported that the section of roadway is in poor <br />condition and had been on the schedule for next year for reconstruction, but has been <br />moved back due to other priorities. The overlay is expected to last at least five years <br />before reconstruction would be r«juired. <br />Goetten asked what the cost of reconstruction would be. Moorse said the cost would be <br />about $550,000. <br />KWey asked if any fabric is laid before the overlay material. Moorse said this was not <br />done The new gravel for the shoulder areas will be done by the City. <br />Hurr clarified the balance amounts on the MSA funds <br />Kelley moved, Goetten seconded, to approve the Willow Drive o\erlay using MSA <br />funds Vote: Ayes 4, Nays 0. Callahan was not present during this item of the agenda. <br />(#12) COUNTY ROAD 15 ROADWAY PROJECT - EAST END - RESOLUTION <br />#3626 <br />Callahan reponed that the right-of-way costs have been reduced by the County to an <br />estimated 557.500. <br />County Representative, Jim Grube. reported that the property located on the south side <br />of CoRd 15 to be used for wetland mitigation purposes was reevaluated. The field <br />inspection based the findings on about 30,000 s f of propeny eligible for use as wetland <br />mitigation, and the cost was determined by the expertise of the County's Real Estate <br />Manager at SO 50 per square foot for a total of $15,000 Based on the County's policy, a <br />50/50 split is done between the City and County for a S7,500 value to the benefit ot <br />Orono resulting in the 557,500 right -ot-way acquisition costs. <br />Callahan inquired if there were any other costs that the City would be involved in paying. <br />Grube said he was unsure if any of the consiniaion costs were passed on and weald have <br />Bruce Polaczvk comment on it. \foorse said he did not know ot anv construction costs <br />that the Cit>’ would be responsible for except for stonn sewer, but there was no storm <br />sew er in the area Moorse said the only participation he was aware of was for wetland <br />mitieation and restoration. <br />13