My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-1995 Council Packet
Orono
>
City Council
>
1995
>
10-23-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 2:07:26 PM
Creation date
10/6/2023 2:04:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/V. <br />To:Chair Sieve Peterson and Orono Planning Commission Members <br />Ron Moorsc, City Administrator <br />Michael P. Gaffron, Assistant Planning Sl Zoning Administfalor <br />Date:August 18, 1995 <br />Subject;#2056 Michael and Barbara Wigley, 1035 Tonkawa Road - Conditional Use <br />Permit - Public Hearing <br />Zoning District: LR-IB, Single Family Lakeshore Residential, One Acre <br />AppUcation: Request for land alteration CUP and variance to excavate in 0-75’ zone and install <br />boulder retaining walls. <br />Pertinent Code Sections <br />Section 10.55, Subd. 8/Section 10.56, Subd 16 (J)/Section 10.22, Subd. 2: <br />Grading prohibited within 75’ of lake. <br />Section 10.22, Subd. 2/Section 10.56, Subd. 16 (L); No hardcover aUowed <br />within 75’ of lake. <br />Section 10.03, Subd. 19: CUP required for lakeshore alteration <br />List of E.xhibits <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />1 <br />J <br />Application <br />Plat Map <br />Propert>' Owners’ List <br />Letter of Request and Cross-Section Sketch Plan <br />Site Plan <br />Survey/Topography (not as-built) <br />letter from City Engineer <br />Comprehensive Plan Excerpts <br />Watershed District Denial Documentation June, 1995 <br />Staff Sketch <br />Summary <br />Applicant proposes to construct two boulder walls within 75’ of the shoreline, one at the <br />ton of a 1 slope, the other at the base of that slope in the flood plain next to the lake. At the <br />base of the slope, the intent is to excavate within the flood plain, creating a terrace at the water s <br />edge approximately 10-15’ deep, backed by a 3.5’ boulder wall, placing excavated material <br />above the wall (see sketch. E.xhibit D).
The URL can be used to link to this page
Your browser does not support the video tag.