My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-1995 Council Packet
Orono
>
City Council
>
1995
>
09-25-1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 1:18:13 PM
Creation date
10/6/2023 1:14:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINtJTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD ON AUGUST 21, 1995 <br />(#18- #2047 LakcMCW Golf - Continued) <br />Peterson commented that the Park Commission reviewed the sketch plan and did not <br />propose a trail on the property but would ask for normal park dedication tees The <br />applicant was informed that t^s amount would be 8% of the lot area or cash in the <br />equivalence of 8*/« of the fair market value before development <br />(#19) #2053 DENNIS PLATTETER, 809 NORTH BROWN ROAD - SKETCH <br />PLAN OF A 3-LOT RESIDENTIAL SUBDIVISION <br />Mr. Flatterer was present. <br />Mabusih reported that the plan is for a division of a 6 37 acre homestead, located to the <br />north side of Sugar Woods development, into three lots M\ structures would be <br />removed. The property is accessed via a platted road The propeny is on a natural <br />environment lake to the northwest, the OHW is at 985 5 elevation 4 ot the total <br />property is a type 3 wetland adjacent to the normal high water level Each lot is shown <br />meeting the two acres of dry buildable It was noted that it the road were moved to the <br />west, the lots would not have the 2 acres of dry buildable required. Lot 2 requires a lot <br />width variance in its present configuration <br />Mabusth reported that the septic would be mound-tvpe systems, and 3 were tested at an <br />8% slope The septic code specifically states that mound systems must be placed on a <br />slope no greater than 6® o Staff could not recommend approval of 3 lot piat based on <br />septic limitations fhe propertv is not located within MUSA <br />Mabusth asked the Commission if they would recommend approv al of current layout? A <br />lot width variance would be required for lot 2 that gains access via a long platted corridor. <br />The lakeshore lot meets 200' at the lake and the 150' setback <br />Flatterer said he has owned the property for 20 years The MUSA line is adjacent to the <br />property to the south The propeny contains alot of sandy area. The applicant selected <br />the building sites based on the views, maintenance ot trees and slopes, and then <br />constructed the lot lines to meet the codes <br />The applicant was informed that with a 150-200' long road, his likely choices would be for <br />3 executive lots or 2 hobby farms, with contemplation for larger cul-de-sacs required by <br />the fire depanment <br />Peterson said it was his opinion that the propeny consisted of tw o lots, not thiee. as there <br />would be too much crowding in order to gain the proper septic Berg agreed with this <br />conclusion <br />27
The URL can be used to link to this page
Your browser does not support the video tag.