Laserfiche WebLink
MINUTES OF THE ORONO PLANNING COMMISSION <br />MEETING HELD TN AUGUST 21, 1995 <br />(«14 - #2056 Michad & Barbara Wigley - Continued) <br />Petenon told the applicant that the Planning Commission does not want residents to wait <br />until a hill is eroding, but he also did not see any problem except by the house The weeds <br />and the structure on the hill should hold back the hill while revegetating according to <br />Peterson. It was also noted that the stairway was in good solid condition <br />Gai&on inquired about a drainage pif>c found on the property 1 he applicant said she had <br />no idea what wras the reason for the pipe The contractor said he would check on the pipe. <br />Laue said defoliating would t>e difficult and would kill the undergrowih <br />Hawn asked what would be used to kill the poison ivy and oak voicing her concern with <br />chemicals washing into the lake. Laue said a spray would be allowed to dry resulting in no <br />run off <br />Laue said the top wail would hold back erosion from the house area It is his plan create a <br />swale with the boulder wall being located higher and the soil lower to catch the drainage <br />and allow it time to percolate thru the soil <br />I ane said an original permit was denied by the MCWD, not because ot the plan, but <br />because the neighbor's contractor was under investigation. The neighbor was asking for a <br />similar boulder wall Schroeder said it would be hard to believe that the permit was <br />denied for any other reason than merit <br />Schroeder said the City ’s Comprehensive Plan sets guidelines for lakeshore The Plan <br />requires that natural vegetation be preserv ed as much as is practical If erosion is present, <br />rip rap can be used The City recommends a natural look <br />The applicant asked what was the definition of aosion It was noted that no erosion was <br />noted by cither the Engineer. Staff, or the Planning Commissioners Schroeder said the <br />only erosion noted was near the home, which can be assisted with walls at that location <br />Wigley said she was looking at taking the grass out and putting in vegetation. Lane said <br />the mulch will also be removed <br />Gaffron asked if the walls were to be approved, what construaion process would be used <br />for this project Laue said two options were available If permission were received from <br />the neiuhbor. he would come across their propeny. drop the materials over the hill to be <br />placed by a machine at the bottom The other alternative would be to bring in the wall <br />material over the lake during the winter and install it in the spring <br />GatTron read into the minutes a letter received from the DNR noting their concern with <br />retaining w alls removing the natural vegetation, with screening, erosion control of the <br />steep slopes, and concern over water level and ensuing construction. <br />20