Laserfiche WebLink
Mn/DOT Metro y.E.TEL :6l2-582“1368 Sep uo 95 15-37 No.OOS F.02 <br />RE5URPACING WORK ON HIGHWAY 12 IN WAYZATA. ORONO <br />ANO LONG LAKE BEGINS FRIPAY__________ <br />«ork on Hi?h^ay 12 frc-r. 1/2 mile eae' of Weyzete Soolevaro in W«yzat« to Old <br />Crystal Say Road in Orcno begins n-day, September 8. <br />Crews will work ri^nts and some days from 7 a.m. Friday, Seotember 8. until S a.m. <br />Fnday September 15. Please watch for signs In the area for lane closure mrormation. <br />There will be two 'anes of traffic, ore lane in each direction when work is taking place <br />from Old Crystal Bav Read to Martha Lane, but seme traffic delays a.m expected. <br />Traffic will be reduced to a single lane for both directions of Highway 12 when work is <br />taking place from Vartha Lane to Wayzata Bo.ilevard. Traffic will be controlled and <br />fflzernstcd by f'Si^^sr'3 during the3S tirrc3. <br />Resurfacing work 'will cause some noise In the areas where crews are working. The k.irme,o..a <br />Departm.ent of Transportation wou d Ike to thank residents, businesses and motorists for the.r <br />pfftier.c^ ciurint^ this projsc:,. <br />For more information, conzact Dan Penn. Project Erginee-. 797-2072. or 2g,npa Lindberfl, Public <br />Affairs Coerziinator, 55>2*1266. <br />highway 12 RESURFACING FRIPAY, SEPT 3 TO FRIPW. SEPT. 15 <br />TJ <br />O <br />n <br />CQ <br />-------------------------------- <br />L*hl<:c <br />lA <br />£•u <br />OJ.a <br />o <br />X3 <br />r3 <br />Occ <br />o <br />0> <br />n <br />s <br />N <br />n:Ou <br />A ^ Wayzata B/vc <br />\' <br />Project Limits